MAINTENANCE
7-79
Installing Rubber Crawler
1. Lower the bucket and blade to raise one track off the
ground, as shown. Place blocks under the machine frame
to support the machine.
2. Slowly turn valve (1) to allow grease to escape from the
grease outlet.
3. Engage the rubber track with the sprocket and position
the other end of the rubber track on the front idler.
4. While rotating the sprocket in reverse, apply horizontal
force to the rubber track to seat it on the idler.
5. Insert a steel pipe into gaps among lower rollers, track
frame and rubber track and rotate the rubber track
slowly to correctly seat the rubber track on the idler.
6. Confirm that the rubber track is correctly engaged with
the sprocket and idler.
7. Adjust track sag. (Refer to "Adjust Track Sag".)
8. After checking that the rubber track is correctly engaged
with the sprocket and idler and the track sag is correctly
adjusted, lower the machine to the ground.
Grease Outlet
1
M1LA-07-036
Direction of Rotation
Steel Pipes
Steel Pipes
Direction of Rotation
M503-07-062
M503-07-063
Summary of Contents for Zaxis 17U-5A
Page 4: ......
Page 8: ...CONTENTS MEMO ...
Page 12: ...MACHINE NUMBERS 4 MEMO ...
Page 84: ...OPERATOR S STATION 1 18 MEMO ...
Page 86: ...BREAK IN 2 2 MEMO ...
Page 108: ...DRIVING THE MACHINE 4 14 MEMO ...
Page 228: ...MAINTENANCE 7 88 MEMO ...
Page 230: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 232: ...STORAGE 10 2 MEMO ...
Page 240: ...TROUBLESHOOTING 11 8 MEMO ...
Page 250: ...SPECIFICATIONS 12 10 MEMO ...
Page 270: ...13 20 NUMERIC KEYPAD LOCK OPTIONAL ATTACHMENT MEMO ...
Page 274: ...INDEX 14 4 MEMO ...
Page 276: ......
Page 277: ......
Page 278: ......