
MAINTENANCE
7-14
Maintenance Guide
A. Greasing
Parts
Quantity
Interval (Hours)
Page
8
50
100
250
500
1000
2000
1. Front
Joint Pins
Bucket and Link Pins
5
7-22
Swing Post and Others
10
or every year
7-22
2.
Blade Pins (ZX26U-5A)
2
or every year
7-24
3. Swing Bearing
1
7-25
4.
Swing Internal Gear
1
7-26
5. Control Lever Universal Joint
2
or every year
7-26
:
In case excavations are performed in water, grease the pin after operation is complete.
:
When using the hydraulic breaker, grease every 50 hours.
: Grease all pins every 100 hours during first time operation up to 500 hours.
: Maintenance required only during first time.
IMPORTANT: Grease front joint pins every day until break-in operation (50 hours) is complete.
B. Engine
Parts
Quantity
Interval (Hours)
Page
8
50
100 250 500 1000 2000
1.
Engine Oil
Check Oil Level
1
7-27
2.
Engine Oil
Change
ZX17U-5A
2.8 L
(3.0 US qt)
7-28
ZX26U-5A
3.5 L
(3.7 US qt)
3. Engine Oil Filter
Replace
1
7-28
: As the oil life is shortened more than normal under high temperature operation condition, shorten the
maintenance interval.
C. Transmission
Parts
Quantity
Interval (Hours)
Page
8
50
100 250 500 1000 2000
1. Travel Reduction
Gear
Check Oil Level
2
7-31
Replace
ZX17U-5A
0.30 L×2
(0.32 US qt)
7-32
ZX26U-5A
0.6 L×2
(0.63 US qt)
7-32
Summary of Contents for Zaxis 17U-5A
Page 4: ......
Page 8: ...CONTENTS MEMO ...
Page 12: ...MACHINE NUMBERS 4 MEMO ...
Page 84: ...OPERATOR S STATION 1 18 MEMO ...
Page 86: ...BREAK IN 2 2 MEMO ...
Page 108: ...DRIVING THE MACHINE 4 14 MEMO ...
Page 228: ...MAINTENANCE 7 88 MEMO ...
Page 230: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 232: ...STORAGE 10 2 MEMO ...
Page 240: ...TROUBLESHOOTING 11 8 MEMO ...
Page 250: ...SPECIFICATIONS 12 10 MEMO ...
Page 270: ...13 20 NUMERIC KEYPAD LOCK OPTIONAL ATTACHMENT MEMO ...
Page 274: ...INDEX 14 4 MEMO ...
Page 276: ......
Page 277: ......
Page 278: ......