TRANSPORTING
6-8
1. Swing the upperstructure so that the blade is positioned
at the rear of the counterweight.
2. Fully retract the blade cylinder.
3. Fully extend the boom, arm and bucket cylinders, as
illustrated to the right.
4. Position the boom straight ahead of the upperstructure.
Apply the boom swing pedal lock.
5. Pull the pilot control shut-off lever to the LOCK position.
6. Stop the engine. Remove the key from the key switch.
7. Set a crane in an appropriate position.
8. Attach shackles to the boom and blade hooks. Securely
thread wire ropes through the shackles.
9. Slowly lift the machine so that shock loads will not be
applied to the machine. Take sufficient care not to lose
the balance of the machine.
ZX17U-5A: 3100 mm (122 in)
ZX26U-5A: 2990 mm (118 in)
ZX17U-5A: 4710 mm (185 in)
ZX26U-5A: 4990 mm (196 in)
ZX17U-5A: 1130 mm
(44 in)
ZX26U-5A: Boom
Cylinder Fully Extend
MABA-06-001
Summary of Contents for Zaxis 17U-5A
Page 4: ......
Page 8: ...CONTENTS MEMO ...
Page 12: ...MACHINE NUMBERS 4 MEMO ...
Page 84: ...OPERATOR S STATION 1 18 MEMO ...
Page 86: ...BREAK IN 2 2 MEMO ...
Page 108: ...DRIVING THE MACHINE 4 14 MEMO ...
Page 228: ...MAINTENANCE 7 88 MEMO ...
Page 230: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 232: ...STORAGE 10 2 MEMO ...
Page 240: ...TROUBLESHOOTING 11 8 MEMO ...
Page 250: ...SPECIFICATIONS 12 10 MEMO ...
Page 270: ...13 20 NUMERIC KEYPAD LOCK OPTIONAL ATTACHMENT MEMO ...
Page 274: ...INDEX 14 4 MEMO ...
Page 276: ......
Page 277: ......
Page 278: ......