
General Index
SMGB0091 rev.2 - 11/2015
IV
3.3.1 Refrigerant piping length
3.3.2 Piping system (Header branch installation) ................................................................................................... 38
3.3.3 Piping system (Line branch installation) ........................................................................................................ 41
3.3.4 Combinations of piping size and piping length .............................................................................................. 42
3.3.5 Refrigerant piping size and multikit/distributor selection
............................................................................... 43
3.4.1 Refrigerant charge amount
3.4.2 Refrigerant charge procedure
3.6 Compatibility with the piping of current installations where R22 or R407C is used
..............................54
3.6.1 Installation procedure for existing pipes ........................................................................................................ 54
3.6.2 When the existing air conditioner is a product of another manufacturer ....................................................... 55
3.6.3 Permissible range for existing air-conditioning pipes .................................................................................... 55
3.6.4 Selection of the renewal kit model
4.3 Electrical connection of the RASC unit
..................................................................................................62
4.4 Transmission wiring between RASC and indoor unit
............................................................................63
4.6 Setting and function of DIP and RSW switches for RASC units
............................................................66
4.6.1 Location of DIP switches and RSW switches
................................................................................................ 66
4.6.2 Functions of dip switches and rotary switches .............................................................................................. 66
4.6.3 Jumper lead setting (JP1~6) ......................................................................................................................... 69
4.6.4 LED’s indication ............................................................................................................................................. 69