INSTALLATION OF OPTIONAL REMOTE CONTROLLER
16
/17
16.3.7
INITIALIZATION OF CENTRAL STATION
The procedure for initialization of the group setting and the
optional setting is as follows
1. Changing to Self Check Mode
Depress the "GROUP (
)
and
(
)" and "MODE"
switches simultaneously, the central station is
changed to the self check mode. In case that there is a
group in operation, the "NO FUNCTION" is indicated
and the central station can not be changed to the self
check mode.
After changing to the self check mode, the LCD
indication is changed from (i) to (vii) as shown below.
Before the indication is changed to (vii), depress the
"GROUP (
)
and
(
)" and "MODE" switches
simultaneously again and remain pressed until
initalization starts, and the central station is changed
to the initializing mode.
(i)
(ii)
(iii)
(iv)
(v)
(All indications: OFF)
(vi)
(All indications ON)
(vii)
(All indications: OFF)
NOTE:
In case that "GROUP (
)
and
(
)" and "MODE"
switches are not depressed again, the self check
operation continues.
2. Initialization
When the central station is changed to the initialization
mode, the LCD indication on the central station is as
shown below. In this condition, depress the "RESET"
switch, and the flickering "06" indication is changed to
ON and the initialization is performed.
(In case that initialization is not required, depress the
"CHECK" switch, the LCD is automatically changed as
shown below).
"06" flickers. Depress "RESET"
switch and "06" is changed to
ON. In case of EEPROM
initialization, it takes
approximately 30 - 60 seconds
Depress "RESET" or "CHECK"
switch
To Connection Check
Group Setting Table of Central Station
RSW of
Indoor
Unit
0 1 2 3 4 5 6 7 8 9 A B C D E F
Indication
of PSC-5S
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
Fill the gap number (1-16) in the above table
Circle the unit number of the master unit
Summary of Contents for FSG Series
Page 2: ......
Page 4: ......
Page 13: ...3 57 7 1 7 ...
Page 14: ......
Page 110: ......
Page 116: ......
Page 146: ......
Page 160: ...9 14 CONTROL SYSTEM n Cooling Operation FSG FSG1 cont ...
Page 162: ...9 16 CONTROL SYSTEM n Cooling mainly Cooling Operation FXG FXG1 cont ...
Page 163: ...CONTROL SYSTEM 9 17 9 6 3 DRY OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Page 164: ...9 18 CONTROL SYSTEM n Dry Operation FSG FSG1 cont ...
Page 165: ...CONTROL SYSTEM 9 19 9 6 4 DRY OPERATION FXG FXG1 I U Indoor Unit O U Outdoor Unit ...
Page 166: ...9 20 CONTROL SYSTEM n Dry Operation FXG FXG1 cont ...
Page 167: ...CONTROL SYSTEM 9 21 9 6 5 HEATING OPERATION FSG FSG1 I U Indoor Unit O U Outdoor Unit ...
Page 168: ...9 22 CONTROL SYSTEM n Heating Operation FSG FSG1 cont ...
Page 170: ...9 24 CONTROL SYSTEM n Heating mainly Heating Operation FXG FXG1 cont ...
Page 171: ...CONTROL SYSTEM 9 25 n Defrosting Operation Control ...
Page 173: ...CONTROL SYSTEM 9 27 9 7 2 GAS BYPASS CONTROL 9 7 3 OVER HEATING PROTECTION CONTROL ...
Page 176: ...9 30 CONTROL SYSTEM 9 7 6 CONTROL FOR AUTO COOL HEAT OPERATION ...
Page 228: ......
Page 229: ...3 57 167 7 21 7 ...
Page 230: ......
Page 324: ......
Page 344: ......
Page 376: ......
Page 423: ......