4 - 16
Disassembly and Reassembly > Deck Mechanism Disassembly
(30) P2 gear assembly (Fig. A-8-1) and
P3 gear assembly (Fig. A-8-2)
1) Lift the P3 gear assembly.
2) Lift the P2 gear assembly.
Note:
When reinstalling the P2 and P3 gear
assemblies, be sure to align the holes in them.
(31) P2 base assembly (Fig. A-8-3) and
P3 base assembly (Fig. A-8-4)
1) Slide the P2 base assembly in the direction
of arrow (A) to release it from the guide hole
in chassis.
2) Slide the P3 base assembly in the direction
of arrow (B) to release it from the guide hole
in chassis.
(32) Loading base (Fig. A-8-5)
1) Release three hooks (H12, H13, H14), and
then lift the loading base.
Hole in P2 Gear Ass'y
(Fig.A-8-2)
(H12)
Hole in P3 Gear Ass'y
BOSS (Tension Lever)
Gear Glove (A)
Hole (B) in
Slider Plate
(H14)
(H13)
P3 Gear Ass'y
(Fig.A-8-1)
P2 Gear Ass'y
(Fig.A-8-5)
Loading Base
(B)
(A)
(Fig.A-8-4)
P3 Base Ass'y
(Fig.A-8-3)
P2 Base Ass'y
Chassis
Fig. A-8 P2 Gear Ass'y, P3 Gear Ass'y, P2 Base Ass'y, P3 Base Ass'y, Loading Base
Summary of Contents for DV-RV8500E
Page 70: ...THE UPDATED PARTS LIST FOR THIS MODEL IS AVAILABLE ON ESTA ...
Page 82: ...LOCATION GUIDE C 1 C Circuit Board Diagrams C 1 VCR Circuit Board Diagram COMPONENT SIDE ...
Page 83: ...LOCATION GUIDE C 2 CONDUCTOR SIDE ...
Page 84: ...LOCATION GUIDE CONDUCTOR SIDE C 3 C 2 S M P S Circuit Board Diagram ...