5 - 7
Adjustment / Maintenance > Deck Mechanism Adjustment
5-3-7 Reel torques
(1) Preparations when using a torque gauge
1) Set the recorder to the loading status, referring to “5-3-6 Method of setting the mechanism to
loading status without inserting tape”.
2) Assemble the torque gauge adapter and torque gauge, and place them on reel.
Torque Gauge
Torque Gauge
Adaptor
Reel Table
3) Check the torque values in the following operation modes:
Item
Fast forward torque
Rewind torque
Playback torque
Reverse search torque
Operation mode
Fast forward
Rewind
Playback
Reverse search
Gauge
Torque gauge
Torque gauge
Torque meter
Torque meter
Measured reel
Take-up
Supply
Take-up
Supply
Torque value
At least 400 g/cm
At least 400 g/cm
40-100 g/cm
120-210 g/cm
Summary of Contents for DV-RV8500E
Page 70: ...THE UPDATED PARTS LIST FOR THIS MODEL IS AVAILABLE ON ESTA ...
Page 82: ...LOCATION GUIDE C 1 C Circuit Board Diagrams C 1 VCR Circuit Board Diagram COMPONENT SIDE ...
Page 83: ...LOCATION GUIDE C 2 CONDUCTOR SIDE ...
Page 84: ...LOCATION GUIDE CONDUCTOR SIDE C 3 C 2 S M P S Circuit Board Diagram ...