(2) While holding both side of the bezel (arrowed A), pull out the bezel
from the lever.
Installing the bezel:
(3) While holding both side of the bezel (arrowed A), install and fix the
bezel to lever.
3
.
Turn on LID LED for identifying the target blade.
See
Identify LED (LID) on/off procedure on page 4-7
4
.
The rebuilding will start within one minute after installing the spare disk
drive. Verify the following LED status in the spare drive that the rebuilding
started.
¢
Active LED: blink in green
¢
Fault LED: blink in amber
5
.
Confirm the rebuild status. See
Identifying rebuild status on page 6-2
section.
6
.
Wait for rebuilding, and after thirty minutes to two hours, it will be
completed.
Replacing parts
5-37
Hitachi Compute Blade 500 Series System Service Manual
Summary of Contents for CB 520A A1
Page 26: ...xxvi Preface Hitachi Compute Blade 500 Series System Service Manual ...
Page 152: ...4 64 Common process for replacement Hitachi Compute Blade 500 Series System Service Manual ...
Page 294: ...6 12 Identifying RAID rebuild status Hitachi Compute Blade 500 Series System Service Manual ...
Page 432: ...9 16 Updating firmware Hitachi Compute Blade 500 Series System Service Manual ...
Page 439: ...Change LOM configuration 10 7 Hitachi Compute Blade 500 Series System Service Manual ...
Page 442: ...10 10 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Page 450: ...10 18 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Page 464: ...11 14 Troubleshooting Hitachi Compute Blade 500 Series System Service Manual ...
Page 465: ...Hitachi Compute Blade 500 Series System Service Manual ...