1
Safety notes
4
1
SAFETY NOTES
◼
Before commissioning, please read the documentation carefully and pay attention to the safety
instructions given in particular. Please consult this manual if anything is unclear.
◼
Make sure that you understand the instructions contained in this manual and that you are sufficiently
informed regarding the way in which the biomass boiler system works. Should you have any queries at
any time, please do not hesitate to contact HERZ.
◼
For safety reasons, the owner of the system must not make any changes to the construction or the
state of the system without consulting the manufacturer or his authorised representative.
◼
Make sure that there is a sufficient supply of fresh air to the boiler room (please heed the relevant
national regulations).
◼
All connections are to be checked before the commissioning of the system in order to make sure that
they are leak-tight. Check all screw connections for strength.
◼
A portable fire-extinguisher of the prescribed size is to be kept by the boiler room. (Please heed the
relevant national regulations).
◼
When opening the door to the combustion chamber, make sure that no flue gas or sparks escape.
Never leave the combustion chamber door open unattended. as toxic gases may escape.
◼
Never heat the boiler using liquid fuels such as petrol or similar.
◼
Carry out maintenance regularly (in accordance with the maintenance schedule) or use our Customer
Service department.
◼
When carrying out maintenance on the system or opening the control unit, the power supply is to be
disconnected and the generally valid safety regulations are to be heeded.
◼
In the boiler room, no fuels may be stored outside the system. It is also not permitted for objects which
are not required for the purpose of operating or carrying out maintenance on the system to be kept in
the boiler room.
◼
When filling the fuel bunker using a pump truck, the boiler must always be switched off. (this is
stamped on the cover of the filling connection). If this instruction is not heeded, flammable and toxic
gases may get into the storage room!
◼
The fuel storage room is to be protected against unauthorised access.
◼
Always disconnect the power supply if you need to enter the fuel storage room.
◼
Always use low-voltage lamps in the fuel storage room (these must be approved for this type of use by
the relevant manufacturer).
◼
The system is only to be operated using the types of fuel prescribed.
◼
Before the ash is transported further, it must be stored temporarily for at least 96 hours in order to let it
cool down.
◼
Should you have any queries, please call us.
◼
Initial commissioning must be carried out by the HERZ Customer Service department or an authorised
specialist (otherwise any warranty claim will not be applicable).
◼
Ventilate fuel storage room for ~ 60 minutes before trespassing /Please refer to the respective country
regulations).
◼
The boiler meets the requirements of the Association of Swiss Canton Fire Insurance Companies or
national fire safety regulations. The customer himself shall be responsible without exception for
ensuring that these regulations are complied with on site!
Summary of Contents for BioFire 1000
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system BioFire 500 600 800 1000 1250 1500 ...
Page 89: ...Annex 14 89 14 ANNEX 14 1 Additional boiler module Hydraulic recommendation 1 ...
Page 90: ...14 Annex 90 Hydraulic recommendation 2 ...
Page 91: ...Annex 14 91 14 2 Solar module Program 1 ...
Page 92: ...14 Annex 92 Program 2 ...
Page 93: ...Annex 14 93 Program 3 ...
Page 94: ...14 Annex 94 Program 4 ...
Page 95: ...Annex 14 95 Program 5 ...
Page 96: ...14 Annex 96 Program 6 ...
Page 97: ...Notes 15 97 15 NOTES ...