Menu navigation and adjustment values
9
37
Term
Description
Unit
Menu "Settings"
Settings
1
Winter must
temperature
Setting up the winter must temperature (20-95). That´s the Buffer bottom
temperature, which will be provided during winter operation.
°C
Summer must
temperature
Setting up the summer must temperature (15-95). That´s the Buffer
temperature (Buffer bottom temperature- respectively if installed Buffer
centre temperature), which will be provided during summer operation.
°C
Difference
temperature
Setting up the temperature difference (-5 -25) between heat supplier (=
boiler) and buffer temperature bottom for excitation of the buffer loading
pump
°C
Switching
temperature
Indicates the switching temperature (10-35) (= average daytime
temperature). In general, the switching temperature conduces to switch
between winter set temperature and summer set temperature.
°C
Temp. increase
Setting up the temperature increase (-25-15) of the required temperature.
▪
Due to heat losses a surcharge to the must temperature winter/summer
of the heating circuit can be set.
°C
Balancing outside
sensor
Adjusting the balancing of the outside temperature (-5 to 5)
°C
Menu "Aggregate-Test"
Agg-Test
1
Buffer loading pump*
Indicates the state of the buffer loading pump:
▪
If the indicator lamp lights up, the buffer loading pump is activated and
the buffer gets charged.
Fastrun heating open
Indicates when fastrun heating is switched to OPEN.
Fastrun heating close
Indicates when fastrun heating is switched to CLOSE.
Menu "Barrier times"
Barrier times
1
Time 1
1 - 2 times can be set. The second time can be added by the +. Example:
▪
time 1:
08:00
– 10:00
▪
time 2:
15:00
– 21:00
-
08:00
– 11:00
Setting up individual buffer tank loading times of every weekday, when it
will be not heated
-
By pressing the symbol Monday preset gets assigned to remaining
weekdays.
-
Summary of Contents for BioFire 1000
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system BioFire 500 600 800 1000 1250 1500 ...
Page 89: ...Annex 14 89 14 ANNEX 14 1 Additional boiler module Hydraulic recommendation 1 ...
Page 90: ...14 Annex 90 Hydraulic recommendation 2 ...
Page 91: ...Annex 14 91 14 2 Solar module Program 1 ...
Page 92: ...14 Annex 92 Program 2 ...
Page 93: ...Annex 14 93 Program 3 ...
Page 94: ...14 Annex 94 Program 4 ...
Page 95: ...Annex 14 95 Program 5 ...
Page 96: ...14 Annex 96 Program 6 ...
Page 97: ...Notes 15 97 15 NOTES ...