6. Visually inspect the pressure pin, lid lock
assembly and lid handle weldment for any
broken or missing parts (Fig. 2 & 6). If
any of the afore mentioned are true, stop.
Take the fryer out of service until a new lid
assembly can be installed. For the lid part
number, see page 5.
7. Next, visually inspect for oil migrating into
the top of the lid through the lid lock assem
-
bly or vent holes. If either of these are true,
this fryer will not pass inspection and the lid
will need to be replaced ASAP. The store
however will be able to temporarily con
-
tinue to use this lid as long as it passes the
pressure pin engagement / disengagement
procedure.
8. Clean and lube the pressure pin, locking
pins and linkage with spindle lube (compo
-
nents shown in Figure. 2.).
9. Have the store bread and cook either a 4,
6, or 8-head load of Original Recipe in the
pressure fryer and start the appropriate
timer.
The lid handle should be fully in the
locked position during this test.
As pressure builds, the locking pins
will engage the lid handle weldment.
(Direction indicated by the arrow.)
Figure 7.
Slide card here to
test pin engagement
/ disengagement
Pin Direction
10. Once the calibrated test gauge reads greater than 3psi (figure 10), check to make sure the locking pin is
engaged in the lid handle weldment. To do this, insert a business card where indicated by the red dotted line
in figure 7. If the business card will not slide between the right side of the lid handle weldment and the locking
block, then the pin is engaged and the lid handle is locked (Figure 8). If you are able to slide the business
card between the right side of the lid handle weldment and the locking block, then the lid handle is unlocked
(figure 9). STOP! Take this fryer out of service until a new lid assembly is installed and do not open the lid
until the pressure gauge reads zero psi (lid part numbers listed on page 5.).
Note! -
If pressure exceeds 12psi during the test, wait until all pressure safely exhausts from the fry pot and then
make sure the deadweight is clean and free from obstruction as well as all associated plumbing.
Figure 6.
Vent
Vent
Vent
Vent
Pressure Pin
Lid Lock Assy.
Lid Handle Weldment
Inspection 35
Inspection 38 & 39
Rev A
Summary of Contents for PFG-691
Page 1: ...Henny Penny Pressure Fryer Model PFG 691 TECHNICAL MANUAL...
Page 2: ......
Page 52: ...Model 691 2 34 SN FH001JC ABOVE Aug 2004...
Page 53: ...Model 691 2 35 SN FH001JC ABOVE Aug 2004...
Page 54: ...Model 691 2 36 SN FH001JC ABOVE Aug 2004...
Page 55: ...Model 691 2 37 BELOW SN FH001JC March 2004...
Page 56: ...Model 691 2 38 BELOW SN FH001JC March 2004...
Page 57: ...Model 691 2 39 BELOW SN FH001JC March 2004...
Page 58: ...Model 691 2 40 BELOW SN FH001JC March 2004...
Page 60: ......
Page 62: ...Model 691 3 2 FIGURE 3 1 FRAME COVER ASSEMBLY Oct 2004...
Page 68: ...Model 691 3 8 FIGURE 3 6 LID COVER ASSEMBLY March 2007...
Page 70: ...Model 691 3 10 FIGURE 3 7 DRAIN PAN FILTER ASSEMBLY Aug 2010...
Page 72: ...Model 691 3 12 FIGURE 3 8A FILTER PUMP ASSEMBLY SN LH028JC BELOW Aug 2010...
Page 74: ...Model 691 3 14 FIGURE 3 8B FILTER PUMP ASSEMBLY SN LH029JC ABOVE Oct 2004...
Page 77: ...Model 691 3 17 FIGURE 3 10 GAS BURNER ASSEMBLY May 2005...
Page 79: ...Model 691 3 19 FIGURE 3 11 GAS PIPING CONTROLS Dec 2009...
Page 84: ...Model 691 3 24 FIGURE 3 15 DEADWEIGHT SOLENOID ASSY SN AP0802029 ABOVE Aug 2010...
Page 87: ...Model 691 3 27 FIGURE 3 16B STEAM BOX HOSE ASSEMBLY SN AP0802028 BELOW Aug 2010...
Page 89: ...Model 691 3 29 FIGURE 3 17 FLUE ASSEMBLY BLOWER SN AP0802028 BELOW Dec 2009...
Page 93: ...Model 691 3 33 FIGURE 3 18 SOLENOID VALVE ASSEMBLY Sept 2005...
Page 95: ...Model 691 3 35 FIGURE 3 19 FRYPOT DRAIN PIPING Oct 2008...
Page 97: ...Model 691 3 37 FIGURE 3 20 LIFT BEAM SHROUDS SN AP0802028 BELOW Aug 2010...
Page 99: ...Model 691 3 39 FIGURE 3 21 COUNTERWEIGHT PULLEY SYSTEM SN AP0802028 BELOW Aug 2010...
Page 139: ...Inspection 12 Rev A...
Page 140: ...Inspection 12 Rev A...
Page 141: ...Inspection 12 Rev A...
Page 144: ...Inspection 15 Rev A...
Page 145: ...Inspection 16 Rev A...
Page 146: ...Inspection 16 Rev A...
Page 159: ...Inspection 24 Rev A Figure 2 1...
Page 160: ...Inspection 24 Rev A Figure 2 2...
Page 183: ......