1219 US 35 West P.O. Box 60 Eaton, OH 45320 (937)456-8400 Fax (937)456-8402 www.hennypenny.com
Inspect for Plumbing Leaks in the Filtration System
Objective and Inspection
To identify if any leaks exist with the filtration system during filtration and then also during
cooking. Tip! A good time to inspect the filtration during cooking would be during the lid lock
engagement / disengagement test. Filtration components can be found in the parts section of
the corresponding technical manual. Pay close attention to the size of the filter components. 8-
head fryers prior to 2004 used a 5gpm pump and ½” plumbing (3/8” check valve) whereas 8-
head fryers built after 2004 used 8gpm pumps and ¾” plumbing (3/4” check valve).
A
Suction Side of Pump
B
Filter Pump
C
Pressure Side of Pump
D
Check Valve
Test Procedure for plumbing leaks
during filtration
1.
Remove the left side panel from the
fryer.
2.
Use a flashlight to inspect the fitings
of the filtration plumbing and
between the filter pump and motor
for oil leaks (figures 1&2).
3.
Drain about half the vat of oil to the
drain pan.
4.
Turn the power switch to the pump
position to pump the oil back up to
the fry pot.
5.
While the oil is pumping, use a
flashlight to inspect for oil leaks.
6.
If leaks are detected with plumbing,
disassemble, clean, and reassemble
the fittings using pipe thread sealant
on threaded fittings, or replacing
any worn sleeve fittings on
compression fittings.
7.
If leaks are detected between the
filter pump motor and the pump,
replace the seal kit.
B
C
B
A
Figure 1.
Front view shown
with the left and
right side panels
removed
D
Summary of Contents for PFG-691
Page 1: ...Henny Penny Pressure Fryer Model PFG 691 TECHNICAL MANUAL...
Page 2: ......
Page 52: ...Model 691 2 34 SN FH001JC ABOVE Aug 2004...
Page 53: ...Model 691 2 35 SN FH001JC ABOVE Aug 2004...
Page 54: ...Model 691 2 36 SN FH001JC ABOVE Aug 2004...
Page 55: ...Model 691 2 37 BELOW SN FH001JC March 2004...
Page 56: ...Model 691 2 38 BELOW SN FH001JC March 2004...
Page 57: ...Model 691 2 39 BELOW SN FH001JC March 2004...
Page 58: ...Model 691 2 40 BELOW SN FH001JC March 2004...
Page 60: ......
Page 62: ...Model 691 3 2 FIGURE 3 1 FRAME COVER ASSEMBLY Oct 2004...
Page 68: ...Model 691 3 8 FIGURE 3 6 LID COVER ASSEMBLY March 2007...
Page 70: ...Model 691 3 10 FIGURE 3 7 DRAIN PAN FILTER ASSEMBLY Aug 2010...
Page 72: ...Model 691 3 12 FIGURE 3 8A FILTER PUMP ASSEMBLY SN LH028JC BELOW Aug 2010...
Page 74: ...Model 691 3 14 FIGURE 3 8B FILTER PUMP ASSEMBLY SN LH029JC ABOVE Oct 2004...
Page 77: ...Model 691 3 17 FIGURE 3 10 GAS BURNER ASSEMBLY May 2005...
Page 79: ...Model 691 3 19 FIGURE 3 11 GAS PIPING CONTROLS Dec 2009...
Page 84: ...Model 691 3 24 FIGURE 3 15 DEADWEIGHT SOLENOID ASSY SN AP0802029 ABOVE Aug 2010...
Page 87: ...Model 691 3 27 FIGURE 3 16B STEAM BOX HOSE ASSEMBLY SN AP0802028 BELOW Aug 2010...
Page 89: ...Model 691 3 29 FIGURE 3 17 FLUE ASSEMBLY BLOWER SN AP0802028 BELOW Dec 2009...
Page 93: ...Model 691 3 33 FIGURE 3 18 SOLENOID VALVE ASSEMBLY Sept 2005...
Page 95: ...Model 691 3 35 FIGURE 3 19 FRYPOT DRAIN PIPING Oct 2008...
Page 97: ...Model 691 3 37 FIGURE 3 20 LIFT BEAM SHROUDS SN AP0802028 BELOW Aug 2010...
Page 99: ...Model 691 3 39 FIGURE 3 21 COUNTERWEIGHT PULLEY SYSTEM SN AP0802028 BELOW Aug 2010...
Page 139: ...Inspection 12 Rev A...
Page 140: ...Inspection 12 Rev A...
Page 141: ...Inspection 12 Rev A...
Page 144: ...Inspection 15 Rev A...
Page 145: ...Inspection 16 Rev A...
Page 146: ...Inspection 16 Rev A...
Page 159: ...Inspection 24 Rev A Figure 2 1...
Page 160: ...Inspection 24 Rev A Figure 2 2...
Page 183: ......