![HENNING MSM12 V3 Manual Download Page 9](http://html.mh-extra.com/html/henning/msm12-v3/msm12-v3_manual_2124104009.webp)
Henning GmbH & Co. KG
page 9
19/02/2019
6.B Starting the Device
In order to switch on the MSM12 mobile rope load meter please press the on/off switch for
a minimum of 3 seconds. The display now shows the Weight Watcher logo as well as a
progress bar. After a short time the display switches over to the main display. The MSM12
is now ready for operation.
To switch off please press the on/off switch for minimum 3 seconds again. The device
switches off and the display lighting is extinguished. If the batteries are run-down, the
MSM12 switches off automatically.