
DISASSEMBLY AND TRANSPORT
8-2
MSHF • 7295-026A
7.
Insert the locking pins in the autolevel
devices and secure them.
8.
Disconnect the electrical supplies
and replace the control cable dummy
plug (for a twin mast construction).
9.
Raise the jacks and remove the
ground supports.
10.
Remove the control box.
There are two possible ways to transport
the basic machine. This can be done with
or without the platform elements being
attached. The transport method depends
on the dimensions of the platform and the
widths and lengths of vehicles permitted by
national regulations.
If the basic machine is too large to be
transported in one piece, take the following
steps.
11.
Disassemble the fences, the gates
and the gate posts.
12.
Disassemble the platform
extensions. Slide in the outriggers
and secure them.
Fig.8-2
Autolevel locking locking pin
Fig.8-3
Control cable dummy plug
Fig.8-4
Securing outrigger
Summary of Contents for MSHF
Page 4: ...IV MSHF 7295 026A...
Page 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Page 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Page 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Page 30: ...SAFETY 3 4 MSHF 7295 026A...
Page 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Page 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Page 83: ...APPENDICES 1 MSHF 7295 026A...
Page 84: ...APPENDICES 2 MSHF 7295 026A...