ASSEMBLY AND ANCHORING
6-2
MSHF • 7295-026A
6.1
Preparation for assembly
Ensure that the site where the
mast climbing work platform will
be assembled accords with the
national requirements and that
permission has been obtained
from the relevant authorities for
the assembly.
- Ensure that a suitable power supply,
good lighting, lifting equipment and tools
are available.
- Ensure that the building site is easily
accessible to the vehicle which will
deliver the mast climbing work platform.
- Prepare the site with suitable support
and anchoring facilities.
- Ensure that the position where the mast
climbing work platform will stand has
good drainage.
- Plan the positioning of the mast
climbing work platform so that where the
mast needs to be anchored, it can be so
anchored with the standard material.
- The components of the mast climbing
work platform mast should be placed as
close as possible to the place where it
will be assembled.
- The electrical power supply connection
must be placed as close to the mast
climbing work platform as possible so
as to reduce the voltage drop to a
minimum. If the voltage reduction is too
great the machine may not function
correctly.
Summary of Contents for MSHF
Page 4: ...IV MSHF 7295 026A...
Page 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Page 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Page 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Page 30: ...SAFETY 3 4 MSHF 7295 026A...
Page 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Page 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Page 83: ...APPENDICES 1 MSHF 7295 026A...
Page 84: ...APPENDICES 2 MSHF 7295 026A...