Settings |
Axes
11
Parameter
Explanation
Encoder model
Connected encoder model
Settings:
Linear encoder
: Linear axis
Angle encoder
: Rotary axis
Angle encoder as linear encoder
: Rotary axis is displayed as
linear axis
Default value: Depending on the connected encoder
Signal period
For linear encoders
Length of a signal period
Setting range:
0.001 µm ... 1000000.000 µm
Default value:
20.000
Output signals per revolution
For angle encoders and for display of a rotary axis as a linear axis
Number of output signals
Setting range:
1 ... 10000000
Default value:
18000
Teach sequence
Starts the teach sequence for determining the
Output signals
per revolution
for an angle encoder based on a specified angle
of rotation.
Display mode
For angle encoders and for the display of a rotary axis as a linear
axis.
Settings:
- ∞ ... ∞
0° ... 360°
-180° ... 180°
Default value:
- ∞ ... ∞
Mechanical ratio
For display of a rotary axis as a linear axis:
traverse path in mm per revolution
Setting range:
0.1 mm ... 1000 mm
Default value:
1.0
Reference marks
Configuration of the
Reference marks
"Reference marks (Encoder)", Page 201
Terminating resistor
Dummy load to avoid reflections
Settings:
ON
or
OFF
Default value:
ON
Error monitor
Monitoring of signal errors
Settings:
Off
: Error monitoring not active
Frequency
: Error monitoring of the signal frequency
Default value:
Frequency
A warning or error message is displayed if one of the
limit values for error monitoring is exceeded.
The limit values depend on the signal of the connected encoder:
Error message with frequency
≥
5 MHz
200
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
Summary of Contents for GAGE-CHEK 2000 Series
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Page 12: ......
Page 13: ...1 Fundamentals ...
Page 22: ......
Page 23: ...2 Safety ...
Page 28: ......
Page 29: ...3 Transport and storage ...
Page 34: ......
Page 35: ...4 Mounting ...
Page 41: ...5 Installation ...
Page 51: ...6 Basic operation ...
Page 74: ......
Page 75: ...7 Commissioning ...
Page 119: ...8 Setup ...
Page 154: ......
Page 155: ...9 Measuring ...
Page 169: ...10 File management ...
Page 176: ......
Page 177: ...11 Settings ...
Page 210: ......
Page 211: ...12 Servicing and maintenance ...
Page 220: ......
Page 221: ...13 What to do if ...
Page 225: ...14 Removal and disposal ...
Page 227: ...15 Specifications ...