16
10.4
When cutting the
fl
ue hole it is recommended that a 105mm diameter core drill is used
where both internal and external access for the
fl
ue installation is available. Where only
internal access is available a 125mm diameter core drill should be used. (Note: Please take
adequate precautions to prevent debris entering the boiler via the
fl
ue outlet).
10.5
Using a 8·5mm drill bit, drill the holes for
fi
xing jig (optional) and hanging bracket.
Locate and secure the supplied wall mounting bracket and
fi
xing jig in position (
fi
gure 12).
Figure 12
10.6
Mount the boiler onto the
fi
xing bracket via the boiler mounting slots, (
fi
gure 12).
10.7
Connect isolation valves to the boiler ensuring the washers are
fi
tted correctly.
NOTE:
Refer to Figure 1 which shows the correct location of each valve.
10.8
Condensing type boilers must be connected to an appropriate drainage system either:
a.
A corrosion resistant or plastic drain must be
fi
tted to allow discharge of
condensate to a drain, see
fi
gure 13a.
b.
Discharged into the internal household draining system. If this is not practical,
discharge can be made externally into the household drainage system or a purpose designed
soak away.
10.9
Using 50cc of water prime the condensate by either removing the bottom of the trap
using an appropriate allen key or via the inner
fl
ue duct at the top of the boiler.
Figure 13a
Figure 13b
Summary of Contents for SARGON 18S
Page 46: ...42 SARGON 18S 24S 30S PRE MIX CONDENSING SYSTEM BOILER User Instructions ...
Page 52: ...48 ...
Page 53: ...49 ...
Page 54: ...NOTES 3003202113 01 ...