01-03
17
34617 Rev D
NANOV TOP DV GAS APPLIANCE INSTALLATION INSTRUCTIONS
Step 3
a.
Using the regulator replacement kit, follow the instructions (Steps 1-3) that come with the kit. After completion
of Step 3 from the kits instructions, return to these instructions.
b.
Remove the tamper-proof cover screw from the natural gas regulator (using snap ring pliers) and install the
cover screw onto the propane gas regulator.
Step 4
a. Removing Logs
Follow the instructions for removing the glass, screen and logs on page 27.
b. Removing the Burner
Using a phillips screwdriver, remove the screws from each corner of the burner. Carefully pull the burner to the
left, off of the burner orifice underneath. Set the burner aside.
Step 5
a. Pilot Orifice
Loosen and remove the screws that hold the pilot bracket to the pilot assembly (four screws in all). Remove the
pilot bracket. Using a 1/2 wrench, loosen and separate the pilot nut from the pilot assembly. See Figure 32. The
aluminum pilot may have to be bent slightly to separate the parts. Replace the natural gas pilot tube orifice
(which will either have come out with the pilot nut or will be in the pilot assembly and have to be pulled out) with
the LP pilot orifice supplied with the conversion kit. With the new orifice in place, tighten the pilot nut to the pilot
assembly and reattach the pilot bracket to the pilot assembly and to the seal plate.
Figure 31
Robertshaw Standing Pilot Valve in the OFF Position
Note
:
Test fittings for leaks with the pilot lit and the burner off as indicated in Step 6.
Figure 32
All manuals and user guides at all-guides.com