   Step 9 - Attaching the Labels

a.

The  installer  conversion  label  and  valve

manufacturer  labels  must  be  completed  and

installed  by  the  individual  completing  the

conversion. 

This  must  be  finished  or  the

conversion is not complete. 

See Figures 35-37.

b.

To fill out the installer conversion label, follow the

example  in  Figure  35. After  filling  out  the  label,

clean an area near the existing rating label and

attach.

Attach  the  valve  manufacturer  conversion

labels as indicated in Figure 37.

Figure 35 - Conversion Label

THIS CONTROL

HAS BEEN CON-

VERTED

TO 

LP

Figure 36 - Robertshaw Conversion Label

Figure 37

Robertshaw Conversion Label Placement

CKP

THIS PLATE MUST BE AFFIXED AS CLOSE AS
POSSIBLE TO THE EXISTING RATING PLATE

.

THE FOLLOWING MUST BE COMPLETED BY THE INDIVIDUAL

CONVERTING THIS APPLIANCE FROM NATURAL GAS TO

PROPANE GAS.

This appliance has been converted on (date) 

  

MO-DAY-YEAR

to  propane  gas  with  Kit  *  CKP  by  (name  and  address  of

organization  making  this  conversion) 

 

JOHN  SMITH

DISTRIBUTING,  1234  ANYWHERE  RD.,  ANYWHERE,

STATE/PROVINCE,

who  accepts  the  responsibility  for  the  correctness  of  this

conversion.

22330A

WARNING!

Do not leave the pressure too low or too high.

This will create a safety hazard!

between  10”  and  11”  water  column  (optimum

pressure is 10.5” WC) for propane. If the outlet

gas  pressure  is  incorrect,  contact  the  gas

supplier or Heatilator Technical Services. When

finished,  turn  the  valve  back  to  the  “PILOT”

position,  turn  off  the  burner,    disconnect  the

Manometer  and  tighten  the  outlet  pressure  tap

screw.

   Step 8 - Resetting the Appliance

a.

Replace the logs as shown on page 27.

b.

Replace  the  glass  and  screen  as  shown  on

page 27.

5. WIRING

a. Wall Switch Wiring

The  installer  shall  supply  a  UL-listed  or  in

Canada, a CSA-listed wall switch. This appliance

was tested with eighteen feet of UL listed 18 ga.

Type CL2 105°C, two conductor “thermostat wire.”

If  other  wiring  materials  are  used  they  shall

comply with local codes. In the absence of local

codes,  they  shall  comply  with  the 

National

Electrical Code ANSI/NFPA 70-latest edition or

Canadian Electrical Code CSA C22.1.

b. Standing Pilot Ignition

A wiring diagram is shown in Figure 38. You must

wire for the fan kit supplied with this appliance at

installation  to  avoid  reconstruction.

Figure 38 - Standing Pilot Ignition Wiring Diagram

Note: 

This  appliance  must  be  electrically  wired  and

grounded in accordance with local codes or, in the absence

of local codes, with 

National electric Code ANSI/NFPA 70-

latest edition

 or the 

Canadian Electric Code CSA C22.1.

All manuals and user guides at all-guides.com

Summary of Contents for NANOV series

Page 1: ...use an appliance malfunction resulting in serious injury and or property damage WARNING If the information in this manual is not followed exactly a fire or explosion may result causing property damage...

Page 2: ...gasoline type lantern fuel kerosene charcoal lighter fluid or similar liquids in this appliance Keep any flammable liquids a safe distance from the appliance 8 While servicing this appliance always sh...

Page 3: ...r contact the Heatilator Technical Services Department Hearth Home Technologies 1915 W Saunders Street Mt Pleasant Iowa 52641 1 800 843 2848 HEATILATOR and NANOV are registered trademarks Hearth Home...

Page 4: ...N h c t i p 2 1 6 o t 2 1 0 r o f n o i t a n i m r e t l a c i t r e v g n i h s a l F f o o R 2 1 P V A N e p i P t n e V h t g n e L 2 1 6 3 P V A N e p i P t n e V h t g n e L 6 3 8 4 P V A N e p...

Page 5: ...E REQUIREMENTS Figure 1 illustrates a variety of ways the appliance may be located in a room The NANOV Series may be installed directly on the floor or raised on a hearth These appliances are certifie...

Page 6: ...e continuous flat surface When the appliance is installed directly on carpeting tile or other combustible material other than wood flooring the appliance shall be installed on a metal or wood panel ex...

Page 7: ...n air Figure 5 Clearances Figure 6 Vent Lengths with One Elbow minimum vertical Figure 7 Vent Lengths with One Elbow 2 vertical or more 25 maximum 1 HORIZONTAL VENT TERMINATION USING SUPPLIED PIECES O...

Page 8: ...igh temperatures and may present a fire hazard Figure 8 Vent Lengths with Two Elbows Figure 9 Vent Lengths with Three Elbows Note Horizontal runs will require the use of one vent support or plumbers t...

Page 9: ...shield maintains minimum clearances and prevents cold air infiltration Secure the wall shield to the framing as shown in Figures 11 and 12 The termination cap height must meet all local and national c...

Page 10: ...walk or paved driveway located on public property 7 feet 2 1 m minimum A vent may not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and ser...

Page 11: ...ery 1 ft of run towards the termination Never allow the vent to run downward This could cause high temperatures and may present a fire hazard c Assembling Vent Sections Use only pipe supplied and list...

Page 12: ...p spacer NAFS6 whenever the vent penetrates a ceiling floor area as shown in Figure 18 Frame the opening with the same sized lumber as used in the ceiling floor joists Unless the flue is offset the ho...

Page 13: ...n B See Figure 21 Once both inner and outer flues are started press section A into section B firmly until all lances have snapped into place Tug slightly on section A to confirm it has completely lock...

Page 14: ...line should be piped into the valve compartment and connected to the 1 2 FIP connection provided on the manual shutoff valve All connections must be tightened and checked for leaks with a soap and wat...

Page 15: ...rifice for your altitude or refer to ANSI Z223 1 latest edition Appendix F V O N A N s a g l a r u t a n e r u s s e r p y l p p u s s a g t e l n I x a m 0 7 n i m 5 4 s a g l a r u t a n e r u s s e...

Page 16: ...gure 29 Removing Control Access Panel Figure 30 Manual Shutoff Valve 1 Valve Regulator 10 5 w c 2 Brass Burner Orifice 059 3 Pilot Orifice 010 4 Conversion Label Figure 28 Conversion Kit 4 CONVERSION...

Page 17: ...burner aside Step 5 a Pilot Orifice Loosen and remove the screws that hold the pilot bracket to the pilot assembly four screws in all Remove the pilot bracket Using a 1 2 wrench loosen and separate t...

Page 18: ...ilot assembly using one of the methods in Step 6c e Turn the position indicator to the ON position and test for leaks at the valve and the burner orifice using one of the methods in Step 6c Step 7 Che...

Page 19: ...ssure too low or too high This will create a safety hazard between 10 and 11 water column optimum pressure is 10 5 WC for propane If the outlet gas pressure is incorrect contact the gas supplier or He...

Page 20: ...connector feed the necessary length of wire through the connector and tighten the screws 2 Make all necessary wire connections to the receptacle and assemble the receptacle and cover to the junction b...

Page 21: ...General Electric RTV103 Black or equivalent Rutland Inc Appliance Mortar 63 or equivalent A high temperature sealant 1 8 inch wide bead minimum must be used to close off gaps between the appliance an...

Page 22: ...that the rock wool touches but does not cover the holes in the burner pan This will provide the glowing embers look See Figure 47 Figure 46 Placing the Vermiculite and Lava Rock top logs removed for...

Page 23: ...Turn wall switch to the OFF position or set thermostat to lowest setting 2 Open the control access panel 3 Turn manual shutoff valve to CLOSED Wait 5 minutes to clear out any gas Then smell for gas i...

Page 24: ...e 2 Check the wiring 3 Check the air shutter adjustment 4 Ensure there are no gas leaks 5 Ensure the glass is sealed and in the proper position 6 Ensure the flow of combustion and ventila tion air is...

Page 25: ...l B 2 o t n i g e b l l i w s e m a l f e h t d n a n o i t a r e p o l a m r o n f o t l u s e r a s i s i h T n r u b o t d e w o l l a s i e c n a i l p p a e h t s a w o l l e y 3 e c n a i l p p...

Page 26: ...ve before cleaning 2 CHECKING THE FLAME PATTERNS The thermopile and thermocouple standing pilot tips should be covered with flame See Figure 49 Inspect the flame of the burner periodically making sure...

Page 27: ...emoval of all glass fragments and sheet metal edge protection strips Vacuum all remaining glass pieces with a shop vac DO NOT VACUUM IF PIECESARE HOT Replace glass with only a Heatilator brand glass p...

Page 28: ...TL Multi Function Remote Control SMART STAT HTL Remote Control with Thermostat Control SMART BATT HTL Battery operated Remote Control with Thermostat Control NAQKE2B Quick Tile Surround NAHN36WF Light...

Page 29: ...I T R A P N O I T P I R C S E D Y T Q 1 1 5 0 4 3 t e S g o L s e i r e S V O N A N 1 2 3 9 9 1 2 6 3 d o o H 1 3 3 2 1 2 2 6 3 e l l i r G r e p p U 1 4 4 0 8 6 2 6 3 y l b m e s s A n e e r c S 1 5...

Page 30: ...34617 Rev D 30 01 03 NANOV TOP DV GAS APPLIANCE INSTALLATION INSTRUCTIONS HOMEOWNER S NOTES All manuals and user guides at all guides com...

Page 31: ...7 Vent Lengths 7 I Input Rate 15 Interior Wall Shield 9 J Junction Box 20 Junction Box Installation 20 L Lava Rock 22 Lighting Instructions Standing Pilot Ignition 23 Lot Set 22 M Mantel Heights 6 Man...

Page 32: ...rafting caused by tight sealing construction of the structure air handling devices such as exhaust fans or forced air furnaces or other causes 5 use of fuels other than those specified in the Operatin...

Reviews: