background image

01-03

31

34617 Rev D

NANOV TOP DV GAS APPLIANCE INSTALLATION INSTRUCTIONS

Index

A

Appliance Locations  5

Appliance Preparation  21

Lava Rock  22

Rock Wool  22

Vermiculite  22

B

BTUs  15

Building Codes  3, 9

C

Certification  3

Chase Installation  12

Chimney Height  12

Clearances  5

Codes  3

Building  3, 9

Electric  19

Gas  3, 15, 16

Manufactured Housing  3

Combustible  Materials    6

Components    4

Conversion  16

D

Disassembling  Vent  Sections    14

E

Electric Codes  19

Exterior Wall Hole  9

F

Finishing  21

High Temperature Sealants  21

Noncombustible  Materials    21

Firestop Spacer Installation  12

Flames

Blue  25

Checking the flame patterns  26

Ghosting  26

Framing  6

Fuel  24

Fuel Conversion  16

G

Gas Codes  3, 15, 16

Gas Line Connection  14

Gas Pressure  15

Glass

Cleaning  27

Condensation    25

Film  25

Glass  Specifications/Certifications    3

H

High Altitude Installation  14

High Temperature  Sealant  Material

21

Hood  21

Horizontal Installation  3

Horizontal Termination

Clearances  7

Vent Lengths  7

I

Input Rate  15

Interior Wall Shield  9

J

Junction Box  20

Junction Box Installation  20

L

Lava Rock  22

Lighting  Instructions

Standing Pilot Ignition  23

Lot Set  22

M

Mantel Heights  6

Manufactured Housing Codes  3

Minimum Installation (MI) Sections

13

N

Noncombustible  Finishing  Material

21

Noncombustible  Materials    6

O

Odor  25

Optional  Components    4, 28

R

Replacement Parts  29

Rock Wool  22

S

Safety Precautions  2

Seasonal  Checklist    24

Setting the Appliance  6

Slip Sections  14

Space Requirements  5

Standing  Pilot

Ignition  26

Operation  24

Start-up Issues  25

T

Termination Cap Locations  9

Termination  Installation    12

U

Upper Grille  21

V

Venting  13

Assembling    13

Assembling  Minimum  Installation

(MI) Sections  13

Attach to Appliance  13

Disassembling  Vent  Sections    14

Slip Sections - Assembly  14

Through the Wall  9

Vermiculite  22

Vertical Installation  3

Vertical Termination

Chimney Height  12

Clearances    11

Multiple Terminations  12

Vent Lengths  11

Vertical Termination Cap  12

W

Wall Switch Wiring  19

Wiring  19

Diagram  19

Junction Box  20

Standing Pilot  19

Wall Switch  19

All manuals and user guides at all-guides.com

all-guides.com

Summary of Contents for NANOV series

Page 1: ...use an appliance malfunction resulting in serious injury and or property damage WARNING If the information in this manual is not followed exactly a fire or explosion may result causing property damage...

Page 2: ...gasoline type lantern fuel kerosene charcoal lighter fluid or similar liquids in this appliance Keep any flammable liquids a safe distance from the appliance 8 While servicing this appliance always sh...

Page 3: ...r contact the Heatilator Technical Services Department Hearth Home Technologies 1915 W Saunders Street Mt Pleasant Iowa 52641 1 800 843 2848 HEATILATOR and NANOV are registered trademarks Hearth Home...

Page 4: ...N h c t i p 2 1 6 o t 2 1 0 r o f n o i t a n i m r e t l a c i t r e v g n i h s a l F f o o R 2 1 P V A N e p i P t n e V h t g n e L 2 1 6 3 P V A N e p i P t n e V h t g n e L 6 3 8 4 P V A N e p...

Page 5: ...E REQUIREMENTS Figure 1 illustrates a variety of ways the appliance may be located in a room The NANOV Series may be installed directly on the floor or raised on a hearth These appliances are certifie...

Page 6: ...e continuous flat surface When the appliance is installed directly on carpeting tile or other combustible material other than wood flooring the appliance shall be installed on a metal or wood panel ex...

Page 7: ...n air Figure 5 Clearances Figure 6 Vent Lengths with One Elbow minimum vertical Figure 7 Vent Lengths with One Elbow 2 vertical or more 25 maximum 1 HORIZONTAL VENT TERMINATION USING SUPPLIED PIECES O...

Page 8: ...igh temperatures and may present a fire hazard Figure 8 Vent Lengths with Two Elbows Figure 9 Vent Lengths with Three Elbows Note Horizontal runs will require the use of one vent support or plumbers t...

Page 9: ...shield maintains minimum clearances and prevents cold air infiltration Secure the wall shield to the framing as shown in Figures 11 and 12 The termination cap height must meet all local and national c...

Page 10: ...walk or paved driveway located on public property 7 feet 2 1 m minimum A vent may not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and ser...

Page 11: ...ery 1 ft of run towards the termination Never allow the vent to run downward This could cause high temperatures and may present a fire hazard c Assembling Vent Sections Use only pipe supplied and list...

Page 12: ...p spacer NAFS6 whenever the vent penetrates a ceiling floor area as shown in Figure 18 Frame the opening with the same sized lumber as used in the ceiling floor joists Unless the flue is offset the ho...

Page 13: ...n B See Figure 21 Once both inner and outer flues are started press section A into section B firmly until all lances have snapped into place Tug slightly on section A to confirm it has completely lock...

Page 14: ...line should be piped into the valve compartment and connected to the 1 2 FIP connection provided on the manual shutoff valve All connections must be tightened and checked for leaks with a soap and wat...

Page 15: ...rifice for your altitude or refer to ANSI Z223 1 latest edition Appendix F V O N A N s a g l a r u t a n e r u s s e r p y l p p u s s a g t e l n I x a m 0 7 n i m 5 4 s a g l a r u t a n e r u s s e...

Page 16: ...gure 29 Removing Control Access Panel Figure 30 Manual Shutoff Valve 1 Valve Regulator 10 5 w c 2 Brass Burner Orifice 059 3 Pilot Orifice 010 4 Conversion Label Figure 28 Conversion Kit 4 CONVERSION...

Page 17: ...burner aside Step 5 a Pilot Orifice Loosen and remove the screws that hold the pilot bracket to the pilot assembly four screws in all Remove the pilot bracket Using a 1 2 wrench loosen and separate t...

Page 18: ...ilot assembly using one of the methods in Step 6c e Turn the position indicator to the ON position and test for leaks at the valve and the burner orifice using one of the methods in Step 6c Step 7 Che...

Page 19: ...ssure too low or too high This will create a safety hazard between 10 and 11 water column optimum pressure is 10 5 WC for propane If the outlet gas pressure is incorrect contact the gas supplier or He...

Page 20: ...connector feed the necessary length of wire through the connector and tighten the screws 2 Make all necessary wire connections to the receptacle and assemble the receptacle and cover to the junction b...

Page 21: ...General Electric RTV103 Black or equivalent Rutland Inc Appliance Mortar 63 or equivalent A high temperature sealant 1 8 inch wide bead minimum must be used to close off gaps between the appliance an...

Page 22: ...that the rock wool touches but does not cover the holes in the burner pan This will provide the glowing embers look See Figure 47 Figure 46 Placing the Vermiculite and Lava Rock top logs removed for...

Page 23: ...Turn wall switch to the OFF position or set thermostat to lowest setting 2 Open the control access panel 3 Turn manual shutoff valve to CLOSED Wait 5 minutes to clear out any gas Then smell for gas i...

Page 24: ...e 2 Check the wiring 3 Check the air shutter adjustment 4 Ensure there are no gas leaks 5 Ensure the glass is sealed and in the proper position 6 Ensure the flow of combustion and ventila tion air is...

Page 25: ...l B 2 o t n i g e b l l i w s e m a l f e h t d n a n o i t a r e p o l a m r o n f o t l u s e r a s i s i h T n r u b o t d e w o l l a s i e c n a i l p p a e h t s a w o l l e y 3 e c n a i l p p...

Page 26: ...ve before cleaning 2 CHECKING THE FLAME PATTERNS The thermopile and thermocouple standing pilot tips should be covered with flame See Figure 49 Inspect the flame of the burner periodically making sure...

Page 27: ...emoval of all glass fragments and sheet metal edge protection strips Vacuum all remaining glass pieces with a shop vac DO NOT VACUUM IF PIECESARE HOT Replace glass with only a Heatilator brand glass p...

Page 28: ...TL Multi Function Remote Control SMART STAT HTL Remote Control with Thermostat Control SMART BATT HTL Battery operated Remote Control with Thermostat Control NAQKE2B Quick Tile Surround NAHN36WF Light...

Page 29: ...I T R A P N O I T P I R C S E D Y T Q 1 1 5 0 4 3 t e S g o L s e i r e S V O N A N 1 2 3 9 9 1 2 6 3 d o o H 1 3 3 2 1 2 2 6 3 e l l i r G r e p p U 1 4 4 0 8 6 2 6 3 y l b m e s s A n e e r c S 1 5...

Page 30: ...34617 Rev D 30 01 03 NANOV TOP DV GAS APPLIANCE INSTALLATION INSTRUCTIONS HOMEOWNER S NOTES All manuals and user guides at all guides com...

Page 31: ...7 Vent Lengths 7 I Input Rate 15 Interior Wall Shield 9 J Junction Box 20 Junction Box Installation 20 L Lava Rock 22 Lighting Instructions Standing Pilot Ignition 23 Lot Set 22 M Mantel Heights 6 Man...

Page 32: ...rafting caused by tight sealing construction of the structure air handling devices such as exhaust fans or forced air furnaces or other causes 5 use of fuels other than those specified in the Operatin...

Reviews: