Heat & Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C, MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. D • 9/19
68
Measurement from top edge
of opening to bottom of
appliance = 24-1/2 IN.
ROOM CEILING
1-1/2 IN. (2 X 4 FRAMING)
TV
12 IN. MIN.
4 IN. MIN.
1/2 IN. X 1/2 IN.
WIRE MESH*
* Wire mesh required for front discharge or open top discharge passive heat installations with discharge
opening of 3 inches or greater.
Wire mesh recommended for front discharge or open top discharge passive heat installations with discharge opening
of less than three inches.
Good Faith Guidelines for TV Installations
Above a MEZZO-C Fireplace with Passive Heat Option
(Single-Sided Appliance Shown)
MEZZO36/36ST-C = 76-1/2 IN. MIN.
MEZZO48/48ST-C = 76-1/2 IN. MIN.
MEZZO60/60ST-C = 76-1/2 IN. MIN.
MEZZO72/72ST-C = 95 IN. MIN.
FIREPLACE
OPENING
2 X 4 FRAMING
2 X 4 OR 2 X 6
FRAMING
WIRE MESH*
= PASSIVE HEAT
DISCHARGE OPENING
2 IN. MIN.
MEZZO36/36ST-C = 48 IN. MIN.
MEZZO48/48ST-C = 48 IN. MIN.
MEZZO60/60ST-C = 48 IN. MIN.
MEZZO72/72ST-C = 67-1/2 IN. MIN.
CHASE CEILING (1/2 INCH WALL SHEATHING/FINISHING MATERIAL)
REQUIRED FOR FRONT AND SIDE DISCHARGE
CANNOT BE INSTALLED ON OPEN TOP DISCHARGE
Figure 10.19 Clearances with Passive Heat Optional Heat Management System Installed
Clearances with Passive Heat Optional Heat Management System
Figure 10.19 shows the required clearances for appliance,
ceiling finishing material and framing members. Ensure
all clearances are maintained.
WARNING! Risk of Fire!
Wire mesh required on bottom of discharge opening when discharge
opening is greater than 3 inches. Secure wire mesh to top of framing.