4 Planning and installation – Installing the heating system
43
5.
Insert the capillary sensor of the STL (3) from above through the
opening (1) in the control console.
6.
Insert the cable tree (4) from below through the opening (1) in the
control console.
M
OUNTING
THE
BOILER
AND
STL
SENSORS
The boiler and STL sensors are now mounted.
The spacer plate is now fastened in place.
The immersion sleeve for the boiler and the capillary sensor of the
safety temperature limiter is located on the top of the boiler HDG
Turbotec.
7.
If necessary, pull the spacer
plate (5) upwards in order to
insert the capillary sensor of
the STL into the immersion
sleeve (1).
8.
Guide the boiler sensor (2)
and the sensor of the STL (3)
into the immersion sleeve (1).
9.
Fasten both sensors using the
spring clip (4).
Figure 4/21 - Installing the boiler and STL sensors
2
3
4
1
5
10.
If necessary, press the spacer
plate down again.
11.
Fasten the spacer plate to the
boiler cladding on the left or
right side with the Phillips-
head screws (1).
Figure 4/22 - Fastening the spacer plate
1
Summary of Contents for Turbotec 50 L
Page 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Page 2: ......
Page 6: ...6 ...
Page 10: ...10 ...
Page 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Page 94: ...94 ...
Page 99: ......