4 Planning and installation – Structural requirements
24
4.2 Structural requirements
I
NSTALLATION
ROOM
B
OILER
ROOM
Heating systems for solid fuels with a nominal thermal power of up to
50 kW may be installed in a boiler room.
H
EATING
ROOM
Boiler rooms for solid fuels with a nominal thermal power of more
than 50 kW must only be installed in so-called heating rooms.
A
PPLICABLE
REGULATIONS
Your local building regulations will always apply. In Germany,
individual state regulations on boilers and furnaces also apply.
Make sure there is an adequate supply of fresh air to the boiler
room
so that there is enough air available for the combustion
process in all of the installed boilers, and to protect the operator from
the hazards of insufficient oxygen.
Binding values for the size of ventilation openings are usually not
specified in the relevant ordinances. The only requirement is that
negative pressure in the boiler room may not be allowed to exceed 3
- 4 Pa. To meet this requirement, we recommend HDG Turbotec
180 cm
.
For rectangular openings, an aspect ratio of 1.5:1 should
not be exceeded. For grating/latticework, an appropriate
modification must be made to ensure the open cross section meets
the specified value.
I
NSTALLATION
A base is not necessary for the installation of the boiler. Ensure that it
is aligned on a horizontal plane. Additionally, the limit values of
DIN 4109 “Soundproofing in building construction” are not to be
exceeded.
More detailed information can be found in the respective ordinances
of the countries and states.
To ensure unhindered operation and maintenance of the heating
system, it is imperative that the heating system is installed in
accordance with the specifications of HDG Bavaria GmbH and that
the minimum spacing requirements are observed.
We recommend that objects which are
not
needed for the operation
or maintenance of the heating system, are
not
stored in the boiler
room.
Building regulations may differ from country to country and state to
state.
For this reason, consult a qualified specialist for the planning and
installation of your heating room.
Observe the fire safety regulations.
Also observe the requirements of the accident prevention and work
safety regulations of the government safety organisations.
Summary of Contents for Turbotec 50 L
Page 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Page 2: ......
Page 6: ...6 ...
Page 10: ...10 ...
Page 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Page 94: ...94 ...
Page 99: ......