7 Cleaning and maintaining the heating system – Procedure
88
2.
Remove the cover of the air control units at the front of the boiler.
3.
Pull both air control unit plugs (3) out of the plug board.
4.
Release the four M6 nuts with an SW10 spanner and remove the
two air control units (2).
C
LEANING
THE
AIR
CHANNELS
5.
Release the four M6 nuts with an SW10 spanner and remove the
two air control lids (1).
6.
Clean both air channels with an appropriate cleaning tool (e.g.
vacuum cleaner).
C
LEANING
THE
AIR
CONTROL
UNITS
7.
Clean the air box (1) and the two secondary air openings (3) using
a vacuum cleaner.
8.
Check the two seals of the air control units (2).
9.
Replace the seals if they are damaged.
10.
Replace the air channel lids, air channel units and plug in the
reverse sequence.
The air control units are now installed.
Figure 7/18 - Removing the air control units
1
3
2
Figure 7/19 - Cleaning the fan units
2
1
3
Summary of Contents for Turbotec 50 L
Page 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Page 2: ......
Page 6: ...6 ...
Page 10: ...10 ...
Page 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Page 94: ...94 ...
Page 99: ......