4 Planning and installation – Installing the heating system
42
24.
Push the control console (1) toward the back until it latches into
place on the screws pre-mounted on the boiler.
25.
Adjust the height of the cladding using the four knurled nuts (2).
26.
Align the front sides of the claddings with the doors on the front
side.
27.
Remove the control console again.
28.
Fasten the left and right boiler claddings with the M6 nuts (SW10).
29.
Tighten the four M6 nuts (SW10) (1) on the stud bolts on the
bottom of the side boiler claddings.
The boiler cladding is aligned.
M
OUNTING
THE
HDG L
AMBDA
C
ONTROL
1
CONTROL
UNIT
L
AYING
THE
CABLES
1.
Remove the packing from the control unit HDG Lambda Control 1.
2.
Carefully turn off the capillaries of the safety temperature limiter
(STL).
3.
Place the control console (5) on the boiler.
4.
Position the control unit HDG Lambda Control 1 (2) over the
control console (5).
Figure 4/19 - Height levelling
2
1
Figure 4/20 - Laying the cables
2
4
3
1
5
Summary of Contents for Turbotec 50 L
Page 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Page 2: ......
Page 6: ...6 ...
Page 10: ...10 ...
Page 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Page 94: ...94 ...
Page 99: ......