
7 Cleaning and maintaining the heating system – Procedure
80
3.
Place the ash pan (4) in front of the boiler.
4.
Open the combustion chamber door (3).
5.
Using the supplied scraper or flat scraper, push the combustion
residue from the flame channel (1) and ash compartment (2) into
the ash pan (4).
6.
Empty the combustion residue into a fireproof container.
7.
Close the combustion chamber hatch (3) in the reverse sequence.
8.
End the “Reload” function by pressing the
Minus
key.
The flame channel and the ash compartment are clean again.
C
LEANING
THE
HEAT
EXCHANGER
SURFACES
1.
Allow the fire in the boiler to burn out and cool off.
Figure 7/5 - Cleaning the flame channel and ash compartment
1
3
4
2
Caution!
Make sure no ashes are left in boiler when it is not in operation, e.g.
during the summer.
Caution!
See the “General safety instructions” section in this chapter.
Summary of Contents for Turbotec 50 L
Page 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Page 2: ......
Page 6: ...6 ...
Page 10: ...10 ...
Page 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Page 94: ...94 ...
Page 99: ......