4 Planning and installation – Installing the heating system
41
21.
Make sure the two sheet metal screws on the rear boiler cladding
in the provided openings on the left or right boiler cladding are
latched into place.
22.
Connect the left (or right) boiler cladding to the back side using
the four steel spring clips (1), as shown above, at the marked spots.
The left or right boiler cladding is connected with the back side.
L
EVELLING
THE
BOILER
CLADDING
23.
Place the control console (1) on the boiler.
The spring steel clips are fastened to the front cover (control
console) on delivery.
Figure 4/17 - Inserting the spring steel clips
1
Figure 4/18 - Inserting the control console
1
Summary of Contents for Turbotec 50 L
Page 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Page 2: ......
Page 6: ...6 ...
Page 10: ...10 ...
Page 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Page 94: ...94 ...
Page 99: ......