10 Preparing the Stud Welding Gun
10
Preparing the Stud Welding Gun
Prepare the stud welding gun by
– mounting the leg assembly
– mounting the chuck
– adjusting lift and hydraulic damping
– adjusting the insertion depth (protrusion).
Do not connect the stud welding gun to the stud welding unit
until it has
been prepared
.
In this way you can avoid any unintentional starting of the welding process.
Select a leg assembly suitable for your welding element:
d
Ceramic leg assembly PSC-2
Order no.: 93-40-040
(d = 28 mm)
for welding elements (RD, MD (DD), PD,UD, ID)
dia. 16 to 20 mm up to length 150 mm
d
Ceramic leg assembly PSC-2
Order no.: 93-40-041
(d = 29 mm)
for shear connectors (SD)
dia. 16 mm up to length 150 mm
Ceramic leg assembly PSC-2
Order no.: 93-40-074
(d = 29 mm)
for shear connectors (SD)
dia. 16 mm up to length 300 mm