
Page
18
of
34
Harvest
by Meridian
H10XX
Assembly
Manual
Step 27
(H1082 Only)
Locate the 41 foot cables. Attach cable to eyebolts on the top cable truss mount brackets. Attach using the
same process specified in step 25. Pull cable past the first truss running them on the inside of the truss. Put the
cable through the inner cable clamps located on the 2
nd
& 3
rd
truss. When the cable is through both cable
clamps, continue pulling the cable to the quicklink located on the joint on the end of the 3
rd
tube. Secure using
(2) 3/8” cable clamps as shown if fig. 26.3. Repeat on opposite side of the auger.
Step 28
(H1082 Only)
Locate the 61 foot cables. Attach cable to eyebolts on the left & right side cable truss mount brackets (Fig.
27.1). Attach using the same process specified in step 25. Pull cable past the first truss keeping the cable on
the outside of the truss. Put the cable through the outer cable clamps located on the 2
nd
& 3
rd
truss. When the
cable is through both cable clamps, continue pulling the cable to the quicklink located on the joint on the end of
the 4
rd
tube. Secure using (2) 3/8” cable clamps as shown if fig. 28.2. Repeat on opposite side of the auger.
Fig. 27.1
Fig. 27.2
Fig. 28.1
Fig. 28.2