37
English
EN
14. Power supply
Model no.:
LXCP12-006060BEH
Input:
100 – 240 V~, 50 – 60 Hz, 0.5 A max.
Output:
6 V DC, 600 mA, only in conjunction with the
Veroval
®
duo control blood pressure monitor
Manufacturer:
Globalcare Medical Technology Co., Ltd.
Protection:
The device is double-insulated and has a primary
fuse that disconnects the device from the mains in
the event of a fault.
Polarity of the DC voltage connection
Protective insulation/protection class 2
Housing and protective
covers:
The power supply unit housing prevents touching
contact being made with parts that are carrying or
can carry a current (fingers, needles, test hooks).
The user must not touch the patient and the outlet
plug of the AC/DC power supply unit at the same
time.
Legal requirements and guidelines
■
■
The device also conforms to the requirements of the European standard
EN 1060: Non-invasive sphygmomanometers – Part 1: General requirements
and Part 3 – Supplementary requirements for electro-mechanical blood
pressure measuring systems; as well as the standard EN 80601-2-30.
■
■
Clinical testing of the measuring accuracy was carried out in accordance
with EN 1060-4 and EN 81060-2. The requirements of ANSI/AAMI test
protocol SP10-1992 are also fulfilled.
Subject to change without prior notice
IFU_Veroval_dc_SK6_0307662_2020-02-10.indd 37
27.02.20 13:09
Summary of Contents for DC3-18
Page 2: ...2 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 2 27 02 20 13 08 ...
Page 38: ...Notes 38 EN IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 38 27 02 20 13 09 ...
Page 39: ...Notes 39 EN IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 39 27 02 20 13 09 ...
Page 40: ...40 Türkçe TR 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 40 27 02 20 13 09 ...
Page 78: ...78 Notlar TR IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 78 27 02 20 13 09 ...
Page 79: ...79 Notlar TR 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 79 27 02 20 13 09 ...
Page 80: ...80 ﻋﺮﺑـﻲ AE 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 80 27 02 20 13 09 ...
Page 114: ...114 ﻣﻼﺣﻈﺎت AE IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 114 27 02 20 13 09 ...
Page 115: ...115 ﻣﻼﺣﻈﺎت AE 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 115 27 02 20 13 09 ...
Page 116: ...116 繁體中文 HK 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 116 27 02 20 13 09 ...
Page 148: ...148 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 148 27 02 20 13 09 ...
Page 150: ...150 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 150 27 02 20 13 09 ...
Page 151: ...151 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 151 27 02 20 13 09 ...