21
English
EN
8.
Record all measured values with the date, time and
medications taken, conveniently and easily with
Veroval
®
medi.connect.
9.
Take measurements regularly. Even if your values have
improved, you should continue to check them for
monitoring purposes.
10.
Always take measurements at the same time of day. As a
person has about 100,000 different blood pressure values
over the course of a day, individual measurements have no
significance. Only regular measurements taken at the same
time each day over a longer period of time enable the blood
pressure values to be assessed meaningfully.
5.2 Applying the cuff
■
■
Before applying the cuff, insert the cuff´s plug into the connector socket on
the left side of the monitor.
■
■
Do not mechanically constrict, compress or bend the cuff tube.
■
■
The blood pressure must be measured on a bare upper arm. If the cuff is
completely open, thread the end of the cuff through the metal ring to form a
loop. The hook-and-loop fastener must face outwards. Hold the cuff by the
grip tab A (see Fig. 1) and pull it up over your upper arm.
Fig. 1
A
B
Fig. 2
IFU_Veroval_dc_SK6_0307662_2020-02-10.indd 21
27.02.20 13:08
Summary of Contents for DC3-18
Page 2: ...2 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 2 27 02 20 13 08 ...
Page 38: ...Notes 38 EN IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 38 27 02 20 13 09 ...
Page 39: ...Notes 39 EN IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 39 27 02 20 13 09 ...
Page 40: ...40 Türkçe TR 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 40 27 02 20 13 09 ...
Page 78: ...78 Notlar TR IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 78 27 02 20 13 09 ...
Page 79: ...79 Notlar TR 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 79 27 02 20 13 09 ...
Page 80: ...80 ﻋﺮﺑـﻲ AE 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 80 27 02 20 13 09 ...
Page 114: ...114 ﻣﻼﺣﻈﺎت AE IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 114 27 02 20 13 09 ...
Page 115: ...115 ﻣﻼﺣﻈﺎت AE 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 115 27 02 20 13 09 ...
Page 116: ...116 繁體中文 HK 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 116 27 02 20 13 09 ...
Page 148: ...148 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 148 27 02 20 13 09 ...
Page 150: ...150 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 150 27 02 20 13 09 ...
Page 151: ...151 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 151 27 02 20 13 09 ...