35
English
EN
13. Technical data
Product description:
Automatic upper arm blood pressure monitor
Model:
Veroval
®
duo control
Type:
DC3-18
Measuring method:
Korotkoff and Oscillometric
Display range:
0–300 mmHg
Measuring range:
Systole (SYS): 50–250 mmHg
Diastole (DIA): 40–180 mmHg
Pulse: 30–199 beats/minute
Display unit:
1 mmHg
Technical measurement
accuracy:
Cuff pressure: ± 3 mmHg
Pulse: ± 5% of the displayed pulse rate
Clinical measuring
accuracy:
Corresponds to the requirements of DIN EN 1060-4
and DIN EN ISO 81060-2; Korotkoff validation
method: Phase I (SYS), Phase V (DIA)
Operating mode:
Continuous operation
Nominal voltage:
DC 6V
Power supply:
4 × 1.5V alkaline manganese Mignon (AA/LR06)
batteries or the optional Veroval
®
power supply
unit
Battery capacity:
approx. 950 measurements
Protection against electric
shock:
Internally powered medical electrical (ME)
equipment (only when batteries are used). Applied
part: Type BF
= Class II ME device (when using the Veroval
®
power supply unit)
Protection against
harmful ingress of water
or solid materials:
IP20 (not protected against moisture,
protected against solid objects ≥ 12.5 mm)
Inflation pressure:
min. 140 mmHg
Comfort Air Technology:
Individual inflation pressure depends on systolic
blood pr30 mmHg
IFU_Veroval_dc_SK6_0307662_2020-02-10.indd 35
27.02.20 13:09
Summary of Contents for DC3-18
Page 2: ...2 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 2 27 02 20 13 08 ...
Page 38: ...Notes 38 EN IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 38 27 02 20 13 09 ...
Page 39: ...Notes 39 EN IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 39 27 02 20 13 09 ...
Page 40: ...40 Türkçe TR 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 40 27 02 20 13 09 ...
Page 78: ...78 Notlar TR IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 78 27 02 20 13 09 ...
Page 79: ...79 Notlar TR 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 79 27 02 20 13 09 ...
Page 80: ...80 ﻋﺮﺑـﻲ AE 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 80 27 02 20 13 09 ...
Page 114: ...114 ﻣﻼﺣﻈﺎت AE IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 114 27 02 20 13 09 ...
Page 115: ...115 ﻣﻼﺣﻈﺎت AE 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 115 27 02 20 13 09 ...
Page 116: ...116 繁體中文 HK 1 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 116 27 02 20 13 09 ...
Page 148: ...148 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 148 27 02 20 13 09 ...
Page 150: ...150 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 150 27 02 20 13 09 ...
Page 151: ...151 IFU_Veroval_dc_SK6_0307662_2020 02 10 indd 151 27 02 20 13 09 ...