39/204
Adjustment of take-up lever timing
3-2-8
1. Loosen screw on fasten collar for take-up lever cam.
2. Set dial disc to
[10 degrees]
.
3. Insert positioning pin from right side.
4. Turn take up lever cam slowly and insert positioning pin
into pin groove.
pin groove
5. Loosen screw.
<Important>
Rotate the Take up lever cam clockwise until pin
ditch touches to positioning pin then tighten the screw.
(No gap between take-up lever cam and crank)
6. Pull out positioning pin.
7. Turn upper shaft and set dial disc to [
C
] to finish.
Summary of Contents for HCS-1201-30
Page 12: ...12 204 2 Outer covers 2 1 Removal of outer covers ...
Page 81: ...81 204 3 4 Needle bar change unit 3 4 1 Fixing of needle bar change unit ...
Page 124: ...124 204 4 Electricity 4 1 Circuit board related parts 4 2 Sensors ...
Page 153: ...153 204 5 4 Revolution 5 4 1 Adjustment of revolution ...
Page 164: ...164 204 5 7 Detection of power outage 5 7 1 Adjustment of power outage detection ...
Page 168: ...168 204 Electrical connection diagram 6 1 1 ...
Page 169: ...169 204 List of electrical connection diagrams 6 1 2 ...
Page 170: ...170 204 6 2 Reference diagram for wiring 6 2 1 Reference diagram for wiring AC Iine ...
Page 171: ...171 204 Reference diagram for wiring AC Iine 6 2 1 ...
Page 173: ...173 204 VFNC1 S Connection of inverter and setting of parameter 6 3 1 ...
Page 174: ...174 204 FR S510W Connection of inverter and setting of parameter 6 3 2 ...
Page 198: ...198 204 7 3 Error 7 3 1 Error and measure ...
Page 202: ...202 204 7 4 Reference date 7 4 1 Tables for timing adjustment value ...