Continuous loading of compressor
Since it will take a long time for compressor to reach the required working conditions, the compressor
shall be started at 25% or 33% loading and kept for about 30 seconds (the startup time length
recommended by Hanbell).
Then the compressor is gradually loaded to 50% (66%) in time "t" and then
loaded to 75% in another"t" time. The time "t" is determined according to different working conditions
and application conditions.
Figure 3-5 Continuous loading time chart of compressor
Summary of Contents for RC2-D
Page 27: ...RC2 D Technical Manual 2 RC2 200 470 D S P terminal box 3 RC2 510 930 D S P terminal box ...
Page 45: ...RC2 D Technical Manual 47 RC2 180D S Drawing ...
Page 46: ...RC2 D Technical Manual 48 RC2 200 620D S Horizontal suction port Drawing ...
Page 48: ...RC2 D Technical Manual 50 RC2 620 930D S Vertical suction port Drawing ...
Page 49: ...RC2 D Technical Manual 51 10 2 RC2 100 930D P Drawing RC2 100 140D P Drawing ...
Page 50: ...RC2 D Technical Manual 52 RC2 180D P Drawing ...
Page 51: ...RC2 D Technical Manual 53 RC2 200 620D P Drawing ...
Page 53: ...RC2 D Technical Manual 55 RC2 620 930D P Drawing ...