RC2-D Technical Manual
cylinder bypasses to the suction side, causing the piston and slide valve to move to the left
and part of the refrigerant gas bypasses the suction port from the compression chamber. At
this time, due to the reduction of refrigerant discharge, resulting in the reduction of
refrigeration capacity. The piston spring is used to push the piston back to its starting position.
If the compressor is started under full load, it will generate over-current start-up. Therefore, in
order to reduce the start-up current of the next start-up, the slide valve should be unloaded to
the minimum load position during shutdown
.
3.2.1
3 or 4 Step Capacity control system
The compressor is equipped with two solenoid valves (RC2-100, RC2-140 and RC2-180) or three
solenoid valves (other models). They can control the capacity of the compressor from the
minimum capacity to the full load state (100%). These two / three normally closed (NC)
solenoid valves are used to control the required capacity.When the compressor with a 3 / 4
step capacity control system, the compressor is loaded through 33% - 66% to 100% or 25% -
50% - 75% to 100% process, and the
compressor is unloaded through 100% -
66% - 33% or 100% - 75% - 50% to 25%
process. If needs to operate under 25%
loading for long time, oil return, motor
cooling and high discharge temperature
should be considered. For example, the
motor is cooled by liquid injection and
the lubricating oil is cooled by external
oil circuit
。
Figure 3-3 (3&4 step) Capacity control
No.
Part Name
No.
Part Name
1
Suction filter
10
Lubricanting oil
2
Suction gas
11
Oil separator filter
3
Motor
12
Discharge gas
4
Oil filter
13
Capillary
5
Suction bearing 14 Solenoid valve
(
25%/33%
)
6
Male rotor
15 Solenoid valve
(
50%/66%
)
7 Discharge bearing 16 Solenoid valve
(
75%
)
8
Muffler tube
17
Sliding valve
9
Discharge gas
*
RC2 -100
~
180 only with
33%/66%
25%/33%
75%
50%/66%
Summary of Contents for RC2-D
Page 27: ...RC2 D Technical Manual 2 RC2 200 470 D S P terminal box 3 RC2 510 930 D S P terminal box ...
Page 45: ...RC2 D Technical Manual 47 RC2 180D S Drawing ...
Page 46: ...RC2 D Technical Manual 48 RC2 200 620D S Horizontal suction port Drawing ...
Page 48: ...RC2 D Technical Manual 50 RC2 620 930D S Vertical suction port Drawing ...
Page 49: ...RC2 D Technical Manual 51 10 2 RC2 100 930D P Drawing RC2 100 140D P Drawing ...
Page 50: ...RC2 D Technical Manual 52 RC2 180D P Drawing ...
Page 51: ...RC2 D Technical Manual 53 RC2 200 620D P Drawing ...
Page 53: ...RC2 D Technical Manual 55 RC2 620 930D P Drawing ...