HAMWORTHY HEATING LTD
2
SHAFTESBURY HE
500001049/N
Figure 2.1 General Overview
2.0 UNPACKAGING
2.1 The boiler is normally supplied as a set of
equipment comprising the following:
a.
Cast Iron Sections mounted on pallets
b.
Accessory kit and tie rods
c.
Casing panels and insulation blankets
d. Control
panel
e.
Matched burner: fuel oil or gas
f.
Flue collector box
g.
Burner mounting plate, drilled ready to accept
burner
h. Steel
cradle
i.
Oil burner nozzle(s) - where applicable
Remove all packing material and inspect the
equipment to ensure that all parts are present and
undamaged.
If in any doubt, DO NOT USE THE EQUIPMENT.
Instead, contact the supplier.
a. Cast Iron Sections
b. Tie Rods
c. Casing Panels
e. Matched Burner
d. Control Panel
f. Flue Collector Box
h. Steel Cradle