background image

18

LOADING CONDITIONS

Permissible loads on lattice beams when erected as described above.

Access ways

Access is usually provided by means of HAKI UTV stairways that are fitted to the outside of 

the scaffold using extra frames (see erection 12).
Steel scaffolds having UTV stairways fitted externally may be built to a height of 37.5 m.
Alternatively, the HAKI Stair Tower may be used. See User’s Manual HAKI Stair Tower.

Lattice beams

Aluminium lattice beams 

Aluminium lattice beams are 

fitted in pairs on the inside 

and outside of the scaffold. 

Both the top and bottom 

tubes must be fixed to the 

frames using KV 48x48 right 

angle couplers. The height 

of the beams is adjusted 

so that the decking will be              

horizontal.
Frames with lattice beams 

must be anchored at the      

fixing points of the beams.
The lattice beams are braced 

against lateral movement by 

the fitting of RA 800 units 

at a maximum of every third 

metre as a basis for further 

scaffolding.

Lattice beam

Permissible 

load

q [kN/m]

Uniformly distributed 

load

Q [kN]

Centre point 

load

P [kN]

Point loads

P

3

 [kN]

Aluminium

FB 4100 AL

FB 6100 AL

FB 8100 AL

4.9

3.0

1.7

19.4

18.3

13.7

7.5

7.5

6.9

7.5

6.9

5.1

Summary of Contents for 564

Page 1: ...HAKI AB 2014 USER S MANUAL...

Page 2: ...ever HAKI has no objection to the customary addition of scaffold tubes and approved couplers to the scaffold Adding components from different suppliers may invalidate the insurance cover HAKI reserves...

Page 3: ...g unit Frame 2000 Guardrail frame Toe board clip Toeboard Base jack General data The HAKI Ram scaffolding system consists of vertical frames decking units and guardrail frames The scaffolding is erect...

Page 4: ...ard L frame RAL 1000 8734100 6 1 Guardrail frame AL SKRD 1655 AL 4052161 5 9 With spring locking catch SKRD 1964 AL 4052191 6 6 SKRD 2500 AL 4052246 7 8 SKRD 3050 AL 4052301 8 9 Guardrail frame GFL 16...

Page 5: ...dth 22 mm Decking unit B 620 mm Load class 3 2 0 kN m2 PL 1655x620 AL 4081160 11 7 PL 1964x620 AL 4081190 14 0 PL 2500x620 AL 4081250 18 3 PL 3050x620 AL 4081300 22 5 B 310 mm Load class 3 2 0 kN m2 P...

Page 6: ...ngle coupler RA 48x48 22 mm 2041010 1 0 Jaw width 22 alt 23 mm RA 48x48 22 mm 2048010 1 2 Wall tie VST 1000 7111100 5 3 With flexible plate VST 2000 7111200 9 1 Two 22 holes in the plate VST 3000 7111...

Page 7: ...il post Landing link panel UTV AL Frame 7211044 3 6 For covering the hole between platform and frame Only for UTV UTV 3050x2000 AL Safety gate with net SGF SGF 1655 7055161 17 0 Continuously adjustabl...

Page 8: ...with tensile load e g when lifting or when scaffolding is used for temporary roof Not for suspended scaffolding Pavement frame 1460 8732201 39 5 With two fixed and two adjustable spigots Bay width 146...

Page 9: ...are designed to provide access to the upper decks from the inside of the scaffold 10 If the scaffold is to be used outdoors erection or dismantling work must be discontinued if the weather conditions...

Page 10: ...cting always check care fully that the material is not damaged Damaged material must not be used For more information on damaged material and renovation please refer to the HAKI Safety Guide 2 Erect t...

Page 11: ...the scaffolding Toeboards must then be added RAL 1000 L frames are otherwise fitted Alternatively RA 2000 frames can be used for the entire top lift Dismantling is carried out in reverse order Scaffol...

Page 12: ...t a height of 1 0 m and provide the top end with an GFL 700 guardrail frame Erect the next lift using a stairway frames handrail and guardrail frames The gap between the scaffold and the stairway is c...

Page 13: ...scaffold tubes 11 SK 700 internal brackets Where required provide the decking on brackets with end guardrails with the aid of L frames Lock the L frames using locking pins and locking hooks 12 SK 700...

Page 14: ...0 brackets are used as the basis for cantilevered scaffolding starting at any level 13 SK 800 external brackets A maximum of three frames or scaffolding of 6 0 m in height can be erected on reinforced...

Page 15: ...f guardrail frames cannot be erected between the base frames i e between C and D SR 48 scaffold tubes are fitted between the outer standards using swivel couplers Pavement frames 17 Pavement frames ar...

Page 16: ...he bottom Cantilevered scaffolding and the lift below the cantilevered scaffolding must be anchored at every lift level Frames with lattice beams must be anchored at the fixing points of the beams The...

Page 17: ...h mm Load class Permissible load kN m2 Main scaffolding decking 620 1655 3050 3 2 0 Bracket decking 310 1655 3050 3 2 0 Permissible construction heights for HAKI Ram Aluminium LOADING CONDITIONS Permi...

Page 18: ...eams are fitted in pairs on the inside and outside of the scaffold Both the top and bottom tubes must be fixed to the frames using KV 48x48 right angle couplers The height of the beams is adjusted so...

Page 19: ...ial 4 Components must be sorted and stacked properly Take care not to pile the stacks too high so that the material lower down in the stacks becomes overloaded and damaged If the material must be stac...

Page 20: ...of attachment apply provided that the com ponent in question is otherwise without load and that only one person is attached to the same component at any one time Components that have been subjected to...

Page 21: ...21 Notes...

Page 22: ...22...

Page 23: ...23...

Page 24: ...lly and vertically 4 Components correctly fitted and locked 5 Bracing correctly fitted 6 Anchoring with right number and placing of ties 7 Decking correctly fitted 8 Guardrail with toeboard if drop is...

Reviews: