background image

6

LIST OF COMPONENTS

Toeboard 

 

FL 3000x150x32 

2025300

 5.8 

Wood, yellow glazing paint  

 

 

 

Any logo can be applied

Toeboard clip

  

LFP 150x32  

2131001

 0.2 

Plastic 

  

 

 

LF 70 

7161006

 1.0

Tie rod

  

SVF 600  

7072060

 0.6 

Rod diameter Ø12 mm 

SVF 800 

7072080

 0.8 

Permissible load 2.5 kN 

 

 

 

 

  

 

Tie rod clamp

 BVF 

7071000

 0.6

Permissible load 2.5 kN

Tie rod tube

  

SVF 450x48  

8832045

 1.9 

Rod diameter Ø48 mm 

SVF 900x48 

8832090

 3.3 

Permissible load 2.5 kN 

SVF 1200x48 

8832120

                        4.4 

  

Right angle coupler

 

RA 48x48 22 mm 

2041010

 1.0

Jaw width 22 alt. 23 mm 

RA 48x48 22 mm 

2048010

 1.2

Wall tie

  

VST 1000  

7111100

 5.3 

With flexible plate 

VST 2000 

7111200

 9.1 

Two Ø22 holes in the plate 

VST 3000 

7111300

 13.7 

 

VST 4000 

7111400

 16.7

 

VST 5000 

7111500

 21.9 

 

VST 6000 

7111600

 24.5

Stair UTV AL

  

UTV 1000 AL  

4102100

 12.1 

With platform and locking catch 

UTV 2500x2000 AL 

4102247

 22.9 

LxH 3050x2000 mm 

UTV 3050x2000 AL 

4102302

 29.2 

Width 600 mm 

 

 

  

 

Handrail AL

 

HL 2500x2000 AL 

4058245

 9.2

 

HL 3050x2000 AL 

4058300

 10.3 

 

  

 

Handrail inner UTV AL

 

HLI UTV AL 

7058253

                     11.4 

Name 

Code 

Item No. 

Weight

Tie rod tube

  

SVF 450x48 AL 

4832045

 1.2 

Tube Ø48 mm 

 

 

 

Permissible load 5.4 kN

Summary of Contents for 564

Page 1: ...HAKI AB 2014 USER S MANUAL...

Page 2: ...ever HAKI has no objection to the customary addition of scaffold tubes and approved couplers to the scaffold Adding components from different suppliers may invalidate the insurance cover HAKI reserves...

Page 3: ...g unit Frame 2000 Guardrail frame Toe board clip Toeboard Base jack General data The HAKI Ram scaffolding system consists of vertical frames decking units and guardrail frames The scaffolding is erect...

Page 4: ...ard L frame RAL 1000 8734100 6 1 Guardrail frame AL SKRD 1655 AL 4052161 5 9 With spring locking catch SKRD 1964 AL 4052191 6 6 SKRD 2500 AL 4052246 7 8 SKRD 3050 AL 4052301 8 9 Guardrail frame GFL 16...

Page 5: ...dth 22 mm Decking unit B 620 mm Load class 3 2 0 kN m2 PL 1655x620 AL 4081160 11 7 PL 1964x620 AL 4081190 14 0 PL 2500x620 AL 4081250 18 3 PL 3050x620 AL 4081300 22 5 B 310 mm Load class 3 2 0 kN m2 P...

Page 6: ...ngle coupler RA 48x48 22 mm 2041010 1 0 Jaw width 22 alt 23 mm RA 48x48 22 mm 2048010 1 2 Wall tie VST 1000 7111100 5 3 With flexible plate VST 2000 7111200 9 1 Two 22 holes in the plate VST 3000 7111...

Page 7: ...il post Landing link panel UTV AL Frame 7211044 3 6 For covering the hole between platform and frame Only for UTV UTV 3050x2000 AL Safety gate with net SGF SGF 1655 7055161 17 0 Continuously adjustabl...

Page 8: ...with tensile load e g when lifting or when scaffolding is used for temporary roof Not for suspended scaffolding Pavement frame 1460 8732201 39 5 With two fixed and two adjustable spigots Bay width 146...

Page 9: ...are designed to provide access to the upper decks from the inside of the scaffold 10 If the scaffold is to be used outdoors erection or dismantling work must be discontinued if the weather conditions...

Page 10: ...cting always check care fully that the material is not damaged Damaged material must not be used For more information on damaged material and renovation please refer to the HAKI Safety Guide 2 Erect t...

Page 11: ...the scaffolding Toeboards must then be added RAL 1000 L frames are otherwise fitted Alternatively RA 2000 frames can be used for the entire top lift Dismantling is carried out in reverse order Scaffol...

Page 12: ...t a height of 1 0 m and provide the top end with an GFL 700 guardrail frame Erect the next lift using a stairway frames handrail and guardrail frames The gap between the scaffold and the stairway is c...

Page 13: ...scaffold tubes 11 SK 700 internal brackets Where required provide the decking on brackets with end guardrails with the aid of L frames Lock the L frames using locking pins and locking hooks 12 SK 700...

Page 14: ...0 brackets are used as the basis for cantilevered scaffolding starting at any level 13 SK 800 external brackets A maximum of three frames or scaffolding of 6 0 m in height can be erected on reinforced...

Page 15: ...f guardrail frames cannot be erected between the base frames i e between C and D SR 48 scaffold tubes are fitted between the outer standards using swivel couplers Pavement frames 17 Pavement frames ar...

Page 16: ...he bottom Cantilevered scaffolding and the lift below the cantilevered scaffolding must be anchored at every lift level Frames with lattice beams must be anchored at the fixing points of the beams The...

Page 17: ...h mm Load class Permissible load kN m2 Main scaffolding decking 620 1655 3050 3 2 0 Bracket decking 310 1655 3050 3 2 0 Permissible construction heights for HAKI Ram Aluminium LOADING CONDITIONS Permi...

Page 18: ...eams are fitted in pairs on the inside and outside of the scaffold Both the top and bottom tubes must be fixed to the frames using KV 48x48 right angle couplers The height of the beams is adjusted so...

Page 19: ...ial 4 Components must be sorted and stacked properly Take care not to pile the stacks too high so that the material lower down in the stacks becomes overloaded and damaged If the material must be stac...

Page 20: ...of attachment apply provided that the com ponent in question is otherwise without load and that only one person is attached to the same component at any one time Components that have been subjected to...

Page 21: ...21 Notes...

Page 22: ...22...

Page 23: ...23...

Page 24: ...lly and vertically 4 Components correctly fitted and locked 5 Bracing correctly fitted 6 Anchoring with right number and placing of ties 7 Decking correctly fitted 8 Guardrail with toeboard if drop is...

Reviews: