HSRXJRXW
[arning on refrigerant leakage
Wafety caution
Rew environmentally friendly refrigerant V;87F
85 WJPJHX NRWXFPPFXNSR TPFHJ
Hombination of outdoor units
Jquipment series
95 WFKJX] RSXJW
:5 HMJHO TSNRXW
;5 OJ] TSNRXW KSV NRWXFPPFXNSR
<5 VJKVNLJVFRX TNTJ NRWXFPPFXNSR
<58 [ork procedure
<59 Xhree principles of refrigerant pipes
<5: Honfirm refrigerant pipe
<5; Jquipment pipe length of bend pipe and branch pipe
<5< Granch pipe
<5= Lather pipe
<5> Tipe specifications and connection methods
<5? Tipe installation
<5@ Peakage testing
<587 Jvacuation
<588 Vefrigerant charging and additional charging
<589 Hheck valve operation
<58: Vequestment of copper pipe specs and thickness
<58; Xrial running
=5 NRISSV YRNX NRWXFPPFXNSR
=58 Gefore installation
=59 Wtandard accessories
=5: ;4way cassette unit installation
=5; Heiling concealed unit installation
=5< Qed static pressure duct unit installation
=5= Migh static pressure duct unit installation
=5> Honvertible unit installation
=5? [all mounted unit installation
=5@ Honsole unit installation
>5 SYXISSV YRNX NRWXFPPFXNSR
?5 JPJHXVNH [NVNRL
85 Tower wiring figure
95 Hommunication wiring figure
:5 Wpecs for power cable and communication wire
;5 Kield wiring
<5 [iring connection among units
=5 [iring of indoor and outdoor
>5 Jlectric characteristic
?5 Nnstallation instruction of central controller
@5 Honnecting method of central controller and connecting board
/iLY7;0
875 Iip switch setting when out of factory
@5 XVNFPSTJVFXNSR
7:
7<
7>
7?
7@
87
8;
8<
8=
8>
8>
8>
8?
8@
8@
9?
9@
:8
:9
::
:;
:;
:<
:<
:=
:=
:=
;7
;@
<:
=8
=?
?=
@:
@?
87<
87=
87=
87>
87@
889
88:
88;
88<
88=
89:
89;