=<
Irainage Xest
Honduct a drainage test after completion of the electrical work5
Iuring the trial3 make sure that drain flows properly through the piping and that
no water leaks from connections5
Nn case of a new building3 conduct the test before it is furnished with the ceiling5
Ge sure to conduct this test even when the unit is installed in the heating season5
8
9
:
;
:
Nnsulation
muffler cavity /air sending0
Wacking joint
Fir volume adjuster
Fir outlet
Jnlarging chart of
profile chart F
Zibration resistance hook
Hhecking meatus
Fir conditioner
main unit
Heiling
Fir suction grille with air filter
Trocedures
Wupply about 8777 cc of water to the unit through the air outlet using a feed water pump5
Hheck the drain while cooling operation5
8
9
@8 Nmrs`kk`shnm ne `hq rtbshnm `mc chrbg`qfhmf ctbs
Tlease consult the after4sales service worker of Maier Fir Honditioner for the choosing and installation
of suction inlet3 suction duct3 discharging outlet and discharging duct5 Halculating the design drawing
and outer static pressure3 and choose the discharging duct with proper length and shape5
Lood example
Gad example
Gad example
Xhe length difference among every duct is limited below 9A85
Veduce the length of duct as possible as can5
Veduce the amount of bend as possible as can5
Yse heat insulation material to bind and seal the part connecting main unit and the flare part of air
discharging duct5 Terform duct installation work3 before the ceiling fit5
A8 H`kbtk`shnm ldsgnc ne sgd chldmrhnm ne sgd rhlokd pt`cq`sd `hq ctbs
Tresuming the unit length friction impedance of the duct is 8Ta6m3 when the dimension of one side of the air duct
is fixed as 9<7mm3 as shown belowA
Wtatic pressure box
Fir conditioner
Jquipped with
air filter /bought0
;
:
:
:
=77m
:
6h
/87m
:
6min0
Iuct/mmxmm0
9;77m
:
6h
/;7m
:
6min0
9<7x<=7
9<7x8@7
Fir volume
G
F
FI:79QMJVF
FI:?9QMJVF
FI;?9QMJVF