71
EXAMPLES OF VERTICAL INSTALLATIONS OF THE MATERIAL
HOIST AGAINST SCAFFOLDING
INSTALLATION AND USE OF ACCESSORIES FOR ANCHORING
AGAINST SCAFFOLDING
TUBE, COUPLERS AND VE FIXING CLAMPS
Scaffolding tubes, orthogonal couplers and VE fixing clamps are used to anchor the lift parallel or
perpendicular to the scaffolding.
Regardless of the type of assembly, a complete anchorage must be provided at each level of the scaffold
and only galvanised steel tube Ø48.3x3.2mm must be used.
For a parallel installation, the length of the tubes to be used will depend on the length of the scaffolding
module. For example, for a 3m long scaffolding module, use tubes of length
≥ 3.10m.
For a perpendicular installation, the length of the tubes to be used will depend on the width of the
scaffolding the length of the tube projection. For example, for a scaffolding module of 0.95m long
+ 1 projection of 1.20m, use tubes of length
≥ 2.25m.
Installation of the anchoring tubes for an installation parallel or perpendicular to the hoist
compared to the scaffolding:
-
After the scaffolding has been set up and secured to the building, the support tubes (1) must be
installed parallel or perpendicular to the scaffold using 2 orthogonal couplers (2) per tube and per
level of scaffolding.
-
Tighten the couplers with a minimum torque of 50Nm.
Summary of Contents for 312175001
Page 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Page 18: ...18 ASSEMBLY EXAMPLES...
Page 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Page 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Page 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Page 67: ...67 1 1 2 2 2 1 4 4 3 3...
Page 70: ...70...
Page 75: ...75...
Page 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Page 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...