47
Detail of the hooking and locking of the tray on the trolley (fig.9)
The complete cylinder is ready for use.
INSTALLATION OF THE CYLINDER BETWEEN THE PLATFORM AND THE TROLLEY
-
With the plate previously hooked onto the trolley, rotate the cylinder so that the ends of the slides
can be inserted between the platform's hooking lugs (fig.10).
-
Insert the pin simultaneously through the hooking lugs of the platform and the cylinder slides, then
lock the shaft with the pin (fig.10).
If necessary, adjust the position of the slides in the cylinder until the horizontal position of the platform is
obtained, proceeding in the same way as in fig.1. The platform installed on the trolley (fig.11) is ready
for use.
USE
Attention, the double orientation carrier is not compatible with a knee joint!
The renovation platform is very efficient as it has many features and can be used on lifts installed vertically
or inclined.
Side panels open for easy loading:
-
Lift the side panel using the handles (Fig. 13) to release the lock, then swing it outwards (Fig. 14).
Detailed
image
Fig. 10
Slides
Hooking
Legs
Pin
Shaft
Fig. 11
Position
adjustment
of the slides
Summary of Contents for 312175001
Page 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Page 18: ...18 ASSEMBLY EXAMPLES...
Page 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Page 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Page 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Page 67: ...67 1 1 2 2 2 1 4 4 3 3...
Page 70: ...70...
Page 75: ...75...
Page 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Page 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...