STAGE 78
FINAL DETAILS FOR THE FUNNEL
01
02
01
. DETAILS FOR THE FUNNEL
78-01
78-07
78-02
78-06
A5
A2 A3
C2
A4
78-05
78-09
A1
B1
B2
C3
B3
C1
78-03
78-04
PWB
A6
C4
78-08
D1
D2
D3
A6
A5
A5
A6
COMPONENTS CHECKLIST
78-01:
Foremast base
78-02:
Lockers and steam
whistle (A1 – A6)
78-03:
Foremast
78-04:
Supports (B1 – B3)
78-05:
Searchlight bracket (x2)
78-06:
Railings and mast details
(C1 – C4)
78-07:
Railing
78-08:
Railing
78-09:
Ladder, mast top and
supports (D1 – D3)
PWB:
Three 2 x 4mm flange
screws
Cut the lockers
A5
and
A6
from frame
78-02
. Fit one
of each type of locker to the searchlight platform on
the port side of the funnel. Pegs on the bases of the
lockers fit into corresponding recesses in the deck.
Glue in place.
Similarly, glue a locker
A5
and a locker
A6
in place on
the starboard side of the funnel, as shown.
32
32
AGORA
MODELS
PB
AGORA
MODELS