11
13
Take the deck assembly from step 4. Identify the cog
53-07
on the underside of the deck, beneath the
second 38cm gun. The screw holes in the angled sides
of the support brackets
73-04
and
73-03
align with
screw holes in the cog
53-07
, as indicated.
Fix the gear housing support bracket
73-04
in place
on the cog
53-07
with two
PB
2 x 4mm screws.
Completed work
The motor for the fourth 15cm gun has been fitted. The
gears for the elevation control of the second 38cm gun
turret have been assembled and fitted in place.
73-03
73-09
53-07
73-08
73-04
PB
2 x 4
51-07
53-07
73-03
53-07
Turn the gear assembly over and fix the left support
bracket
73-03
in place on the gear housing
73-09
with a
PB
2 x 4mm screw, as shown.
As you position the gear housing, guide the end of
the gear arm
73-08
round the motor mounting
51-07
. Two small pegs on the end of the gear arm
snap into place on the motor mounting (arrow). Make
sure the parts are fully supported whilst doing this.
Fix the other gear housing support bracket
73-03
in
place with two
PB
2 x 4mm screws.
12
14
15
PB
2 x 4
PB
2 x 4
16
16
AGORA
MODELS
PB
AGORA
MODELS