![Hach CM130 User Manual Download Page 51](http://html2.mh-extra.com/html/hach/cm130/cm130_user-manual_3212248051.webp)
Start guided installation
1.
Push
menu
. Select Maintenance>Installation (scroll up). Complete the steps that show on the
display. The display screens are shown for reference in
Appendix A: Screens—Install the
on page 74.
2.
Wait for the analyzer to shut down. When the display is off, disconnect the power cord from the
electrical outlet.
Note: For user safety, the analyzer will automatically go back to idle mode if the power cord is not disconnected
in 5 minutes or less after the display goes off.
Note: When power is removed from the analyzer for more than 10 minutes, a power-loss beep is heard at the
remote indicator for approximately 5 minutes.
3.
Remove the pump clamp from the reagent delivery module.
English
49
Summary of Contents for CM130
Page 1: ...DOC023 53 80540 CM130 11 2018 Edition 5 User Manual...
Page 2: ......
Page 18: ...Figure 9 Analyzer dimensions 16 English...
Page 65: ...Figure 22 Remove the pump clamp English 63...
Page 77: ...English 75...
Page 79: ...English 77...
Page 80: ...78 English...
Page 81: ...English 79...
Page 82: ...80 English...
Page 83: ...English 81...
Page 84: ...82 English...
Page 85: ...English 83...
Page 86: ...84 English...
Page 88: ...86 English...
Page 90: ...88 English...
Page 92: ...90 English...
Page 94: ...92 English...
Page 95: ...English 93...
Page 96: ...94 English...
Page 98: ...96 English...
Page 99: ...English 97...
Page 100: ...98 English...
Page 101: ...English 99...
Page 102: ...100 English...
Page 103: ...English 101...
Page 104: ...102 English...
Page 105: ...English 103...
Page 106: ...104 English...
Page 107: ...English 105...
Page 111: ......