![Hach CM130 User Manual Download Page 31](http://html2.mh-extra.com/html/hach/cm130/cm130_user-manual_3212248031.webp)
4.
Use a drill to make the mounting holes for the backplate. Make the hole diameter applicable to
the fasteners used.
a. Ceiling mount:
Make a two-hole pattern 72.4 mm (2.85 in.) wide with the cable opening in
the middle. Put the holes at least 37.4 mm (1.47 in.) in front of the cable opening.
b. Wall mount:
Make a two-hole pattern 133.4 mm (5.25 in.) long that is 50.8 mm (2 in.) below
the cable opening. Align the holes vertically.
English
29
Summary of Contents for CM130
Page 1: ...DOC023 53 80540 CM130 11 2018 Edition 5 User Manual...
Page 2: ......
Page 18: ...Figure 9 Analyzer dimensions 16 English...
Page 65: ...Figure 22 Remove the pump clamp English 63...
Page 77: ...English 75...
Page 79: ...English 77...
Page 80: ...78 English...
Page 81: ...English 79...
Page 82: ...80 English...
Page 83: ...English 81...
Page 84: ...82 English...
Page 85: ...English 83...
Page 86: ...84 English...
Page 88: ...86 English...
Page 90: ...88 English...
Page 92: ...90 English...
Page 94: ...92 English...
Page 95: ...English 93...
Page 96: ...94 English...
Page 98: ...96 English...
Page 99: ...English 97...
Page 100: ...98 English...
Page 101: ...English 99...
Page 102: ...100 English...
Page 103: ...English 101...
Page 104: ...102 English...
Page 105: ...English 103...
Page 106: ...104 English...
Page 107: ...English 105...
Page 111: ......