![Hach CM130 User Manual Download Page 29](http://html2.mh-extra.com/html/hach/cm130/cm130_user-manual_3212248029.webp)
Remote indicator mounting
N O T I C E
In accordance with UL 61010-1, the remote indicator must be installed 1.5 m (4.9 ft) or more from patients in the
hemodialysis treatment room.
Attach the remote indicator to a wall or ceiling in the treatment room. The fasteners are supplied by
the user.
Note: An illustration is supplied for each step number starting at step 3.
1.
Identify the installation location for the remote indicator.
2.
Put the cable for the remote indicator through the wall or ceiling from the analyzer to the
installation location of the remote indicator.
The cable is supplied by the user. Refer to
on page 3 for the cable specifications.
English
27
Summary of Contents for CM130
Page 1: ...DOC023 53 80540 CM130 11 2018 Edition 5 User Manual...
Page 2: ......
Page 18: ...Figure 9 Analyzer dimensions 16 English...
Page 65: ...Figure 22 Remove the pump clamp English 63...
Page 77: ...English 75...
Page 79: ...English 77...
Page 80: ...78 English...
Page 81: ...English 79...
Page 82: ...80 English...
Page 83: ...English 81...
Page 84: ...82 English...
Page 85: ...English 83...
Page 86: ...84 English...
Page 88: ...86 English...
Page 90: ...88 English...
Page 92: ...90 English...
Page 94: ...92 English...
Page 95: ...English 93...
Page 96: ...94 English...
Page 98: ...96 English...
Page 99: ...English 97...
Page 100: ...98 English...
Page 101: ...English 99...
Page 102: ...100 English...
Page 103: ...English 101...
Page 104: ...102 English...
Page 105: ...English 103...
Page 106: ...104 English...
Page 107: ...English 105...
Page 111: ......