32
Table 23 Blade server power-on methods
Power-on method
Application scenario
Powering on the blade server together with the enclosure
•
The blade server is installed
and the chassis is not powered
on.
Powering on the blade server by pressing the power on/standby
button
The chassis is powered on, the
blade server is installed but is in a
down state. The blade server
system power LED is steady amber.
Powering on the blade server from the OM Web interface
Powering on the blade server by using an OM command
Powering on the blade server through the blade server HDM Web UI.
Prerequisites
Before you power on the server, you must complete the following tasks:
•
Install the server and internal components correctly.
•
Connect the server to a power source.
•
As a best practice for the internal components to operate correctly, do not perform the power on
action immediately after powering off the server. Wait for over 30 seconds for HDD drives to
stop rotation and electronic components to be powered off completely
Guidelines
If the blade server is successfully powered on, the system power LED turns steady green. For more
information about the position of the LEDs, see “
Procedure
Powering on the blade server together with the enclosure
If you want to power on the server together with the enclosure, configure the power-on delay for slots
first. After configuration, power on the enclosure, and the blade server is powered on automatically
based on previous settings. No extra action is required.
For more information about the power-on delay for slots, see the OM online help.
Powering on the blade server by pressing the power on/standby button
Press the power on/standby button to power on the server. For information about the position of the
power on/standby button, see “