44
CXP modules are available in two types. One type is with a rubber pull latch and the other is with a
plastic pull latch. These two types also differ in sizes.
The installation and removal procedures are the same for the CXP modules with a rubber pull latch and
CXP modules with a plastic pull latch. This guide uses the CXP module with a plastic pull latch as an
example.
To install a CXP module:
1.
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded. For
more information, see "
."
2.
Unpack the CXP module. Do not touch the golden plating of the module.
3.
Correctly orient the CXP module. Gently push the module into the port until it has firm contact with
the port.
{
If the card where the CXP module is to be installed is horizontally oriented, make sure the pull
latch is on top of the CXP module.
{
If the card where the CXP module is to be installed is vertically oriented, make sure the pull latch
is on the left of the CXP module.
4.
Connect the fiber to the module. For the installation procedure, see "
Summary of Contents for S12500-X
Page 35: ...26 Figure 20 Grounding the switch through the RTN wire of the DC power module...
Page 80: ...71 Figure 51 Replacing an LPU 1 1 Loosen the captive screw 2 Pull the ejector levers outward...
Page 138: ...129 Figure 75 CXP fiber cable 1 Connector 2 Pull latch 1 2...
Page 152: ...143 Figure 91 Cable routing from the left side for an S12510 X AC S12510 X DC switch...