![H3C H3C S5100-SI Installation Manual Download Page 59](http://html2.mh-extra.com/html/h3c/h3c-s5100-si/h3c-s5100-si_installation-manual_3168113059.webp)
Installation Manual
H3C S5100-SI/EI Series Ethernet Switches
Chapter 3 Installing the Switch
3-13
1)
As shown in Figure 3-17, drill two holes having a diameter of 5 mm (0.2 in.) in the
wall on the same horizontal line, with a distance of 170 mm (6.7 in).
Note:
Drill two holes according to the sizes of anchor kits and screws so that anchor kits could
go into the holes, only the edges could remain outside the wall, and the screws could
be fixed on the wall tightly.
2)
Insert anchor kits into the holes and keep only the edges outside the wall.
3) As shown in Figure 3-17, drive screws into the anchor kits, keeping the inside of
screw head at least 1.5 mm (0.06 in.) away from the edge of the anchor kit so that
the switch could hang on the screws securely.
1.5
mm(Min)
X
mm
Figure 3-17
Wall mounting
4)
Align the two installation holes at the bottom of the switch with these two screws to
hang the switch.
Caution:
When mounting the switch, keep the Ethernet ports of the switch facing downwards
and the two sides with ventilation holes vertical to the ground.
3.4 Magnet Mounting
The S5100-8P-EI, S5100-16P-EI, S5100-8P-PWR-EI, and S5100-16P-PWR-EI series
Ethernet switches support magnet mounting: